Specifications:
Pipelay Derrick Barge for sale The 2000T/3000T slewing crane will be installed on aft deck. Deck house will be on The barge has fully air-conditioned accommodation for up to 310 people in cabins The barge will be designed for worldwide unrestricted service with exclusion of 2. Classification / Registration 2.2 Rules and Regulations 2.3 Certificates 3. General Specification 3.1.2 Environmental Conditions 3.1.3 Design Temperatures and Humidity Summer condition : 3.2 Principal Dimensions 3.3 General Description 3.3.1 Under Double Bottom 3.3.2 On Double Bottom 3.3.3 Middle Deck 3.3.4 Main Deck 3.3.5 A Deck 3.3.6 B Deck 3.3.7 C Deck 3.3.8 D Deck 3.3.9 E Deck 3.3.10 F Deck 3.3.11 Helicopter Deck 4. Outfitting Part 4.1.1 Anchor 4.1.2 The Combined Windlass 4.2 Mooring equipment 4.2.2 Hydraulic Multifuction Winch 4.3 Positioning System 4.4 Lifesaving Equipment 5 Propulsion, Generators/Aux. Equipment General requirements The following electric systems are installed on board: 5.2 Generators Main data : Emergency generator(Maker : Caterpillar) Main data : 5.3 Auxiliary equipment 6 Electrical Equipment 6.1 General Principle 6.2 General Rule 6.4 Inner Communication and Alarm 6.5 Navigation and Communication Apparatus 7. Pipelay System Conveyor system & powered transverse conveyors with elevating and non Firing Line All stations sheltered Control Room Tensioner (Maker : Remacut) A&R Winch(Maker : Remacut) Davits Stinger (fixed) 8 Crane (Maker : ZPMC) 8.2 Main Parameter (2) Auxiliary 1# hook (3) Luffing (4) Revolving (5) Whip (2 sets) Price & terms : Please enquire using the email form below. If you cannot find the vessel, crane, rig or equipment that you need, We can arrange delivery of equipment and towage of rigs and vessels where needed. The details mentioned above are believed to be accurate but are not guaranteed.
Newbuilding Barge for Sale - 3000t & 2000t
New building Pipelaying Barge for Sale
1. Introduction
The vessel is non-propelled shallow water pipelay barge. Pipe laying water depths
will be up to 300 m. the firing line be provided starboard on main deck. The pipe crane
be provided for pipe transfer and store.
the forecastle deck.
all with individual bathroom facilities. There are conference room, offices, gymnasium
and recreation rooms. Separate well equipped laundry facilities are available for use.
The barge has a well equipped medic room with hospital.
Arctic waters. Primary operational area will be all shallow water area less than 300m.
2.1 Class
The barge, which including the hull, engine, electrical and special equipments, shall
satisfy the latest requirements of the current international convention, regulations and
ABS rules and regulations, and enter into the classification, obtaining the following class
notation:
A1 CRC Derrick/Pipelay Barge
The latest revision of the rules, regulations and certificates of the classifying and
governing authortities shall be applied.
Following international convention and regulations will be complied :
1. ABS Rules for Classification and Building of Steel Barges.
2. International Convention on tonnage Measurements 1967/1969.
3. International Convention of the Prevention of Collisions at Sea 1972, including
amendments.
4. International Convention for the Safety of Life at Sea, Consolidated Edition 2004
including all amendments in force.
5. International Convention for the Prevention of Pollution from Ships, 1973,
Protocol of 1978 Relating and Amendments of 1992 (MARPOL)73/78
6. IMO code on noise levels on board ships, A 468 . X11
7. International Convention on Load Lines, 1966
8. International Telecommunication and Radio Regulator of 1973/1976 and 1982
including latest GMDSS-rules for radio communication.
9. International Electronical Commission, electrical Installation in Ship
10. ILO Convention for Crew Accommodation on Board Ships
11. ILO Convention regarding Safety of Working on Board Ships
The following certificates will be available :
1. Classification Certificate for Hull
2. International Oil Pollution Prevention Certificate
3. International Tonnage Certificate
4. International Load Line Certificate
5. Ship Safety Radio Certificate
6. Ship Safety Equipment Certificate
7. Lifting Appliances Certificate
8. Live Saving Equipment Certificate
9. Seaworthiness Certificate
10. Crew Accommondation Certificate
3.1 Design Conditions
3.1.1 Operating Modes
The Ship shall be designed for the following operations :
• Pipe laying operations with a single joint S-lay system
• Heavy lifting operations.
Pipelaying Conditions
The vessel will be able to continue operations in the following environmental
conditions :
• Wind speed : Vw = 16 [m/s]
• Significant wave height : Hs = 2.5 [m]
• Wave period (peak) : Tp = 6.0 – 12.0 [s]
• Current speed : Vc = 1.5 [kn]
• Spectrum type : Jonswap
• Heading : 0°-360°
The following design temperatures are considered for the design :
Maximum ambient air temperature : +45 ºC @ 90% relative humidity
Minimum ambient air temperature : -15 ºC
Max. seawater temperature : +32 ºC
Min. seawater temperature : -2 ºC
Maximum internal temperature in all s paces : 25 ºC
(except the engine rooms)
The accommodation HVAC system shall be designed according the following :
• Ambient 40ºC@ 70% RH
• Maintained 25ºC ±1@ 50% RH
Winter condition :
• Ambient -20ºC @ 30% RH
• Maintained 20±1ºC @ 30-40% RH
Fresh air supply should not be less than 28.8cbm/h.
Length overall (LOA) excl. stinger : 169.00 m
Breadth (moulded) : 46.00 m
Depth moulded to main deck : 13.50 m
Operational draught : 7.00-9.00 m
Max displacement : 63,594 t (approx.)
Ballast capacity : 35,000 cbm
Fuel oil capacity : 4,000 cbm
Potable water capacity : 3,000 cbm
Accommodation cabin 310 beds
The vessel will be a steel, all welded barge with a helicopter platform will be
situated at forecastle deck.
One (1) full revolving crane to be installed in the after area of deck.
Summary of arrangement of decks is as following :
Double bottom will be constructed between the two longitudinal bulkheads. There
will be some ballast tank, fuel oil tank, lubricate oil tank, sewage and dirty oil tank etc, in
the double bottom, and pipe tunnel will be at the each side of it.
There will be engine room, pump room, ballast water tank, fuel oil tank etc.
Fore and aft side tank will be arranged as mooring position winch room. Middle
side tank will be as ballast water tank, ECR, CO2 room, store room, refrigerant,
air-condition, refrigerator etc.
Main deck is a continuous deck. The 2000T/3000T slewing crane will be situated
on the aft deck. The pipelaying work room will be on the starboard deck from aft end to
fore. Port side of the forecastle will be accommodation area. There will be hospital,
change room, shower room, laundry, drying room etc.
A deck will be in the forecastle as accommodation quarters. There will be galley,
air-condition room will also be in this area.
There will be twenty- eight (28) 4P cabins,air-condition room, lavatory, laundry,
drying room on the B deck.
There will be twenty- one (21) 4P cabins, thirteen (13) 2P cabins, air-condition
room, lavatory, laundry, drying room on the C deck.
There will be thirty-four (34) 2P cabins,air-condition room, lavatory, laundry, drying
room on the D deck.
There will be four (4) 2P cabins, twlve (12) 1P cabin, meeting room, and lavatory,
laundry on the E deck.
A central control room will be on the F deck. In the control room there will be
navigation console, mooring position console, ballast water console.
The helicopter platform will be at the fore end of the barge. It is suitable for
SIKORSKY S-61N to take off and landing. Communication and navigation equipment,
leading light, skid-proof grid, draining system will be fitted on the platform.
4.1 Navigation Anchor
Two sets of navigation anchor equipments to be arranged on the B-deck. An
anchor, anchor chain cable, chain stopper, hawse pipe, chain pipe and windlass to be
included in every set.
Weight : 12900 kg
The vessel will be equipped with two windlasses with type of combined windlass.
Each windlass contains one declutchable cable lifter, declutchable mooring drum and
warping end
4.2.1 The Mooring Winch
The vessel is equipped with two double drum hydraulic mooring winches, arranged
on the main deck of stern.
The vessel is equipped with five hydraulic multifunction winches totally. Two of the
winches are arranged on the middle of main deck and one above the firing line of stern.
A twelve point positioning system be installed.
The twelve point positioning system consist of :
Twelve single drum winches (1100kN rating force each)(Maker: ZPMC)
2500 m Ø 76 mm wires
Twelve (12) 12T anchors
4.4.1 Lifesaving Boat
Enough lifesaving boats and rafts will be arranged on each side of B deck.Which
satisfy the SOLAS requirements.
5.1 Electrical installation
The electrical equipment is suitable for a humid, salt laden atmosphere and proof
against vibrations and accelerations normal to a marine environment.
440 V, 60 Hz, 3 ph. For vessel’s auxiliaries, pipelay system, cranes and winches
220 V, 60 Hz, for lighting an small consumers
24 V, DC for alarm, main diesel control,engine room alarms
Main generators(Maker : Hyundai)
The four generators are of the brushless type, totally enclosed construction, suitable for
parallel operation.
Type : HYUNDAI Diesel Engine 8H25/33, Generator HFC714-84K
Rated voltage : 450 V, 60 Hz, 3 phase
Rated power : 2256KW each
The emergency generator is of the brushless type, air cooled.
Type�FCaterpillar 3406 DITA
Nominal voltage : 450 V , 60 Hz, 3 phase
Rated power : 315 KW
The following auxiliary equipment is installed:
• Sewage treatment unit
• Incinerator
• Watermakers
• Sprinkler system
• Starting air compressors
• Barge air compressors
• MDO separator / purifier
• Bilge water separator
• Refrigeration plant
• HVAC plant
• Compactor
• Workshop equipment
• Pumps
• Fan
• Fifi pump
(1) The main electrical equipment will be to comply with the marine environmental
conditions and to have ABS certificate.
(2) The marine cables temperature class will be to permitted in 85°C.The power
cables conductor cross-section of less than 1.5mm2 and the lighting and control cables
conductor cross-section of less than 1mm2 are not to be used.
Item : Main generator
V : AC450
Hz : 60
Phase : 3
Wire : 3
Item : Emergency generator
V : AC450
Hz : 60
Phase : 3
Wire : 3
Item : Crane
V : AC440
Hz : 60
Phase : 3
Wire : 3
Item : Winch
V : AC440
Hz : 60
Phase : 3
Wire : 3
Item : Ballast Pump
V : AC440
Hz : 60
Phase : 3
Wire : 3
Item : Lighting
V : AC220
Hz : 60
Phase : 1
Wire : 3
Item : Alarm
V : AC220/DC24V
Hz : 60
Phase : 1
Wire : 3
6.3 Lighting and Illumination
The lighting lamp and control device will be to install according as the requirement
of various places
The following equipment is installed :
The command telephone
Daily service telephone
Public address system
Radio / TV antenna and satellite communication / TV device
Engineers call system
Refrigerating chamber call system
Sick bay call system
CCTV
Local area network
Fire alarm
General alarm
Watertight alarm
CO2 releasing alarm system
Engine room monitoring system
1) Sounding apparatus : 2 units
2) Radar : 2 units
3) DGPS : 2 units
4) Gyrocompass : 1 unit
5) Speed log : 1 unit
6) Weather map facsimile receiver : 1 unit
7) AIS (Automatic Identification System) : 1 unit
8) Rain-water cleaner and wiper : 6 units
9) Fog diaphone : 1 unit
11) Navigation data recorder : 1 unit
12) GMDSS : 1unit
13) NAVTEX : 1 unit
14) Satellite communication F station : 1 unit
15) Ultra short wave radio station for helicopter : 1 unit
16) Aviation wireless radio-phare set : 1 unit
17) Two-way VHF for life boat : 3 units
18) EPIRB : 1 unit
19) SART : 2 units
Concept : Starboard mounted single joint S-lay system
Capacity : 4” – 48” diameter pipe
Maximum external diameter : 60 inch
Pipelaying speed : 3km/day
elevating capabilities are provided.
5 welding stations (Maker: Serimax)
1 NDE station(Maker:Rd-tech or GE)
1 repair station
1 coating station(Maker: Selmer or Hennecke)
Tension machines are remotely controlled from the working bridge. Local
controls provided in the pipe tunnelalong the firing line.
2 tensioners, 100 T each
A&R winch, 1200 m, ö88 mm wire, 200T minimum tension
Five (5) mounted with load cells at starboard stored on board ,1×50t&4×30 t
Line-up tools and pipe facing/beveling machines are not included.
8.1 General Description
The crane described in these plans and specifications will be a total revolving
heavy lift floating crane for installation on a crane ship, the vessel will be used for
offshore construction in world-wide service.
(1) Main hook
Main hook load : 3000t x 30m(stationary over stern)
Max height (30m radius) :
80m
2000t x 35m (revolving)
Speed with full load : 1.5 m/min
Speed with empty load : 3.0 m/min
Auxiliary 1# hook load : 600t,
Height above main deck(min radius) 80m
Depth under water 150m
Speed with load : 0-10.0 m/min
The time from boom horizontal to min radius 15min
Max. Main hook load : 2000t
Speed with load : 8 min / r
Speed with empty load : 4 min / r
Hook load : 50t
Speed with load or without load : 60 m/min
please send us an email to mail@worldoils.com stating your
requirements and we shall find it for you.
--------------------------------------------------------------------------------------------------------
Search words(for official use only) -
Pipelay Derrick Barge for Sale
2000Ton Pipelay Barge
Pipelay Barge for sale
3000Ton Pipelay Derrick Barge for Sale
Derrick Pipelay barge for sale
Newbuilding Pipelay barge for sale
2000t & 3000t New Pipelay Barge for Sale
Newbuilding Derrick Pipelay Barge for sale - 2000t & 3000t
-------------------------------------------------------------------------------------------------------
Select equipment to compare...