Specifications:
Workover Rig For Sale Technical Specification LCI-750 Double Drum Drilling Rig with mast hook load capacity 365,000 lbs, powered with two Caterpillar C-15 diesel engines with two new Allison S6610 transmissions with torque converter. Mast is 114 ft (35.76m), 365,000 lbs API capacity. Drawworks is 1000hp capacity. All equipment is mounted on a 700 series Seven-axle carrier. Rig equipped with a telescoping substructure 17 FT 6IN ( 5.3 m) height. Group I. Basic rig Section 1.0 : Carrier Heavy Duty Prime Mover 7 Axle Carrier : 100Klb total capacity. All lights and brakes are equipped for attachment to the truck. All axles have spring brake chambers for safety. Tires (16 - 16 : 00 X 20, 14 Ply) : • All tires, disc wheels, fourteen 16:00 x 20, all terrain tread. Tire rating 52,000psi (23.5 t/cm2) total, all tires inflated to 100psi. Two spares included with rig. 100-Gallon Fuel Tank – (Two) : • Two 100-gallon (416 L) fuel tank, side mounted on carrier frame. Tanks are connected for equalization. Tool Box : • One tool storage box of steel plate construction, reinforced doors with chain stops. Doors have lockable hasps. Eight (8) Platforms With Handrails - Operator Side & Off-Operator Side side of unit at bed level, running continuously from operator’s position to cab of unit. Each platform is approximately 6’ (1.8 m) long x 2’ (0.6 m) wide. Handrails attached to platforms on operator and off-operator’s side of rig. Includes stair with handrails from platform to ground. Deadline Anchor : • Hercules 129 HA 129 deadline anchor to be used with compression type weight sensor. Drum type, mounted on carrier frame in front of drawworks frame. Four Pedestals For Hydraulic Jacks : • Pedestals under front jacks for rig stability. Four pedestals required. There will be six jacks for leveling the rig. 50 GPM (189 LPM) Hydraulic System : • System is designed to operate at a maximum of 2Kpsi (140.6 Kg/sq. cm) with 50 GPM (189 LPM) at 2,100psi. • Hydraulic pump driven from PTO on transmission. Air Activated clutch for pump engagement and disengagement. • 325-gallon (1230 L) hydraulic oil tank including installation, Filler cap, breather and combination oil level, and oil Temperature gauge. Six (6) Hydraulic Jackscrews : • Six hydraulic leveling jacks, two mounted in rear bumper, two mounted mid point of rig to remove weight of rig from axles and to provide greater lateral stability, and two mounted behind the front axle. Each jack has an adjustable support screw with locking nut feature. • Tong hydraulic circuit is designed to operate up to 50 GPM- 2000psi (189 LPM-140.6 kg/sq. cm) at 2,100-RPM intermittent duty. Includes connectors, pressure, and return lines, pressure gauge, directional flow valve, and pressure • regulating valve. (Does not include tongs.) Handling Winch (One) : rated at 100 ft minute (30 m) at 50 GPM and 2Kpsi at 110 RPM. • Ratings are for first wrap on drum. • 325 feet (99 m) of 1/2” line provided with winch. (Fail-safe brake, winch pull-in and run-out is hydraulically powered.) • Winch sheaves provided in crown. • Winch controls are located at rear of unit near operator’s console. • Cage to be installed around the winch for protection. 6 cylinders turbocharged, after cooled diesel engine with rating of 540 hp at 2100 rpm. Equipped with limiting speed governor, air throttle actuator, lube and fuel filters, alternator and flywheel housing. High ambient radiators and suction fan, permanent type anti-freeze, single exhaust with spark arrested diverted to off-operator’s side with muffler. Engine oil pressure, amp, and water temperature gauges are Electric start. Tru-flow 1000 or equal air compressors will be used. Both engines can run at one time, or one engine can be used alone for rig operation. The operator side engine is set up to run the rig down the road, normally. Both engines are set up with hydraulic pumps for power to the hydraulic system. All air and pressure gauges will carry the vender certs. Transmission Allison (Two) : • Allison S 6061 RB model six-speed transmission (five forward, one reverse) with converter and oil cooler. Air over hydraulic dual controls, with air Iine indicator. Power shift from cab and from rear control. Section 1.2 : Drawworks- LCI-1000hp Model are 42” (106.7 cm) diameter x 12” (30.5 cm) wide, lined with 1 in (2.5 cm) x 12” (30.5 cm) x 12” (30.5 cm) API drilled brake blocks, full wrap dead-end equalized. Brake rims are removable with rings for splash water-cooling. Brake operation shafts are mounted on ball bearings; these are self energized type for positive application and release by operator. Drum barrel is 18” (45.7 cm) diameter x 38” (96.5 cm) long, mounted on double row self-aligning spherical roller bearings on a 6 ½” (16.5 cm) drum shaft. Clutch single line pull is 42,500lb on bare drum and in first gear. linkage on drawworks is located outside frame. Brake Water Cooling : • Includes water circulation of the water system with air and water piping from reservoir to main drum water circulation brake rims. Water source is from external source, with pump (25-gpm). A warning lite will be installed for high temp. Drawworks Drive : • Consists of: • ASA-100-3 (1 ¼”) pitch, Triple strand, roller chain • Chain drive from input sprocket-to-sprocket on jackshaft • ASA-100-3 (1 ¼”) pitch, Triple strand, roller chain as final drive to main drum. Grooved Jacket : Main Drum-1 1/8” : • Lebus counter balanced sleeve is grooved for 1” 1/8 wireline, to assist spooling, and reduce line wear. Lebus to be certified by vender. Hydrotarder : • Fawick 28VC 1000 air clutch, gates, inlet air valve, piping. • 325-gallon (1230 L) water tank, lines, valves, and plumbing installed on rig. • Driven from the main drum thru triple-strand 1 ¼” pitch drive chain Combined Gear Box : • Cushman model 279 combined gear box consisting of right angle gear box and drop box. Right angle gear box ratio is 1:1 to drive single drum drawworks. Drop box to transfer the torque from final shaft to rotary. Pressurized lubrication system. Rotary Drive : Application included • Is provided in the right angle drop box, for a power connetion. The drive can be installed at a later date if required. It will include the rotary drive shaft to rear chain case at the rear of the rig. Sandline Drum 42X 8 Sandline drum with 42x 8 brake size, for handling 16,500 feet of 9/16 wire line on the drum . Brakes are removalable for water splash cooling on the brake rims. Single line pull is 26,000 lbs on the drum. Elevated Chain Rotary Drive (Double Chain) : • Elevated chain drive is oil bath type consisting of drive sprocket at bottom of case with ASA 140 –2 (1 ¾”) pitch double Section 1.3 : Mast 114’ Mast : • 114’ (33.5 m) clear working height with an API rated static hook load of: • 330Klb with 8 lines strung. • 365Klb with 10 lines strung. • Mast is designed to withstand a wind of 69-mph from any direction provided the four jacks on the vehicle are properly deployed and the mast is properly guyed. Telescoping twin box structural mast is designed and constructed to API standards. • Two-section construction with the upper section telescoping into the lower section for over-the-road position - Top section of mast automatically latches to lower section, when extended. • Lock control at base of mast • Ladder to crows nest on crown • The mast is attached to its support frame at the pivot point near the rig’s rear bumper. It is supported during roading by a rest (headache frame) near the front of the rig. Each leg of the lower section contains an adjustable support screw. • Mast has large girts and braces that do not extend inside, for extra block clearance. • Mast includes: installation, front rest and two internal load lines to rig from crown and two form top of lower section, with tail chains and tightening boomers, All cabling, chains, clamps, pin locations, turnbuckles and attaching devices will carry the vender certs, with load cap, and certs. • 4” x 5,000 Lb standpipes, all welded, 1502 unions Crown : • Bender Crown arrangement for 8 or 10 line string-up with conventional block shall hang flat with mast: • One-36” (91.4 cm) diameter fastline sheave, grooved 1 1/8” (2.8 cm) • One-36” (76 cm) diameter deadline sheave, grooved 1 1/8” (2.8 cm) • Three-30” (76 cm) diameter sheave cross-mounted, grooved 1 1/8” (2.8 cm) • Two-Catline sheaves • Crown sheaves are steel with flame-hardened grooves. • Sheaves are mounted on Timken tapered roller bearings. All crown sheaves will carry the vender certs, for approval. • Fittings provided for individual greasing of bearings. • Crows nest (crown platform) provided for safety when servicing crown sheaves, floor of expanded metal, handrails and toe boards around crown with entrance at ladder. • Attachment for four wind guylines from crown to ground is provided on crown beams Tubing Board : • Tubing board, of all welded construction, is automatically lowered into working position as mast is telescoped up and is raised into folded position as mast is telescoped down for transits. • Tubing board fingers are for 17,000 ft (5182 m) of 2 7/8” (7.3 cm) or 11,400 ft (3475 m) of 3 ½” (9 cm) tubing. • Tubing board mounted at 55 ft (16.8 m) above setback for racking doubles. • 2’ 6” (.6 m, 15.2 cm) wide monkey board/walkway included. • Handrails around tubing board for safety. • Man safety attaching post is installed on each side of the tubing board, and at the center in the rear of the board to attach safety line and escape line to. Raising, Lowering And Telescoping : • Mast is hydraulically raised and scoped by hydraulic cylinders, and unlocking upper section from lower section and extending until the spring-loaded latches snap into operating position extends upper section. • Mast is retracted in like manner. When latches clear the latch seats, a control line is pulled to retract latches, and mast shall lower to its stacked position with section re-locked together, mast is lowered to headrest. • Locking pins shall be painted orange. Mast Controls : • Raising, lowering and telescoping controls are installed at operator’s position near base section of mast, which are unlatched and moved at time of raising or lowering the mast. Weight Indicator : • Weight indicator complete with sensor, 10” dial indicator, box mount and 25 ft. hose assembly. This is to be calibrated in daN, as well as lbs. It will carry the vender certs. • Load and crown block saver installed on drawworks. • Automatically disengages clutch and sets main drum brakes when block comes too close to crown. • Working floor height of 17.5 ft (5.3m) with 14' ft- in clear under rotary beams. • 4.5 (14.7 “) are the maximum height when scoped down for transportation. • 10ft 6in maximum width when scoped down for transportation. • Capacity of 365,000 lb (160 mt) on rotary beams and 225,000 lb (100 mt) on setback. • Substructure base shall be 20' (6.2m) by 10 ft 6 in wide with an elevated floor 18ft.(5.48) wide x 18 ft (5.48 m) long. Floor area is 18 by 18 full workspace, with folding wings on each side to be 4ft per side when folded out.. Floor and fold down walkway to be plated with diamond floor plate. Work floor to be equipped with removable handrails with toe plate (150 mm). • One stairway from substructure work floor (operator platform) to carrier folding walkway and one stairway from substructure floor to ground. • Substructure to be equipped with pipe ramp with steel plate complete with stairway from substructure floor to catwalk. • Setback to be covered with 3 in (7.6 cm) thick oak timbers. • Provide two tong back up post. • Provision for rat hole and mouse hole. • The BOP handling system includes two (2) crane rails integrally mounted under the drill floor. Each rail is rated for 5 tons capacity. • Catwalk assembly 4'-0" wide x 45' long x 3'-6" high (1219 mm x13.7 m x 1066 mm) with built-in stair. . Carrier Ramp : • One Carrier Ramp 10 ft (3 m) wide x 18 in (45 cm) high x 55 ft (16.8 cm) long. The ramps are to include tire guide rails and are to be plated top and bottom with steel plate. The carrier ramp includes a mast base support section with jack • Substructure and rig ramp to be provided with all necessary pins, jackscrews, turnbuckles, lugs, and associated equipment required for connection of substructure and rig ramp with the rig. • Ramp to have hinged section approximately 15 ft (4.6 m) front end to fold ramp for transportation. Section 2.1 : Hydraulic Catworks - Make-Up And Break-Out : • Hydraulic breakout cylinder has 6 ft (1.8 m) stroke with 20,000 lb (9027 kg) maximum line pull. • Hydraulic make-up (spinning) cylinder has 6 ft (1.8 m) stroke with 20,000 lb • (9027 kg) maximum line pull. Cylinder mounted in mast section. Includes wireline, turn back sheaves and plumbing to rig hydraulic system. • Both cylinders are Controls are located at operator position planetary winch 8000 lb. capacity. Winch will have a wire cage for protection around the winch; the control for the winch is remote, by air. floor level to the 36 in. high catwalks • Two (2) ea.. x 36 in. x 28 ft. long pipe racks Section 5.0 : Rotary Table 22” square solid steel master bushing, spiral bevel gears, precision bearings throughout, removable box cover with lifting eyes, positive pinion shaft lock and centralized lube system. gage and kill line. The mud line will be welded with a 1502 union. Section 8.0 : Rig Additions mast failures is installed on the drawworks, and is set for locking the brakes down. Section 8.2 : Safety Climbing Device • The safety climber is attached to the mast with cable and belt. Section 8.3 : Geronimo Chair.cost included in climber • Safety chair and T-bar type seat is complete with brake device. • Four 5/8” wire rope cables to the ground from the mast crown, two additional from the mid section, and two more from the tubing board to the ground are required. . All cable, hooks, shackles will be certified from the vender with rating. All crown lugs will be stamped and certified. Section 8.5 : Block-Hook • – 5 sheave x 1 1/8” sheave 200 ton block with hook, The block will be shipped here to be used for the pull test at the factory. Section 8.7 : Wire Rope • Drill line 1 1/8”diameter X 1,640 feet, certs will be provided for all drill line, and cabling for the rig. Section 8.8 : Dead Line Anchor - Indicator Assy… Anchor for 1.125 diameter wire rope, for mast pull of 365,000lbs for 10 line string up on the crown of the mast. The anchor will be certified by the vender . Group IV. Fabrication, Rig Up And Test (Work to be done at cost plus) Rig Up - Test - Rig Down to consist of following: • Furnished rig and structural. • Level site and accurately mark machinery location to well center per approved rig layout. Furnish temporary timber mats (if required) for mounting mast base, pumps, tanks and houses. • Set the mast, and assemble drilling substructure. Set stairs, pipe ramp and handrails. String drilling line to crown and traveling block. • Set and align rotary table. Furnish and install alignment blocks and tie downs. • High-pressure mud discharge piping. Piping and assembly quoted as a separate item in this quotation • Raise mast to vertical and operate traveling equipment. • Rig down and load out. Disassemble rig and load on truck. Group V Commissioning And Training : • 2 Days commissioning and training by Qualified LCI Rig Engineer included in bid. If you cannot find the vessel, crane, rig or equipment that you need, We can arrange delivery of equipment and towage of rigs and vessels where needed. The details mentioned above are believed to be accurate but are not guaranteed. -----------------------------------------------------------------------------------------------------------------------
750hp Workover Rig - LCI 750
Drilling Rig Package
• 7-axle heavy-duty Carrier suspension shall be a 7-axle with
• Eight-platforms, hinged along operator’s and off-operator’s
Tong Circuit :
• Hydraulic powered planetary winch 8Klb (3.6 t) line pull,
Section 1.1 : Engine/Transmission Engine Assembly (Two) :
• Diesel engine Caterpillar C 15 four stroke cycle,
included. Engine kill valve located at operator's position.
Single Drum Model 42 X 12
• Model 4212 Main Drum Winch Assembly :
• Full air, Fawick ” clutch outside drawworks frame. Brakes
Lubrication :
• Centralized lubrication system to all bearings and brake
• Parmac 202 Hydrodynamic Brake assembly with dual rotary.
Crown Saver Installation :
Group II : Substructure
Section 2.0 : Substructure
Hydraulic Telescoping Substucture :
Catwalk Assembly :
Group III : Additional Equipment :
Section 3.0 : Handling Winch
• Rig comes equipped with one winch. Additional hydraulic
Section 4.0 : V-Door Ramp And Pipe Racks
• One (1) each 48 in. x 3ft-6in. x 45 ft. Catwalk from the rig
• One 22” rotary table, 44” centers complete with split
Section 6.0 : Upper Chain Case Assembly : Included
Section 7.0 : High Pressure Piping
• One 4 in 5000psi high pressure mud line and a manifold for
Section 8.1 : Crown-O-Matic
• combo crown and dwks type Crown-O-Matic for saving
Section 8.4 : Mast Guylines
Section 9.0 : Rig-Up and Test :
Price & terms : Please enquire using the email form below.
please send us an email to mail@worldoils.com stating your
requirements and we shall find it for you.

Search words(for official use only) :
Workover Rig For Sale
750hp Workover Rig - LCI 750
LCI 750 - Workover Rig for sale
-----------------------------------------------------------------------------------------------------------------------
Select equipment to compare...