Oil & Gas land drilling rigs for sale, Land drilling rigs for sale
Oil consultants , Oil & gas dictionary, Oil research news, oil production news, oil reports, oil producing cuontries, oil major organisations, oil drilling consultants, oil demand, oil production, oil development
Home Biofuels Oil & Gas Directory Glossary Consultants Research Training News Newsletter Events Oil & Gas Jobs Contact WOGO
Land Drilling Rigs Offshore Rigs Swamp Barge Rigs Oilfield Container Camps Oil Price History Ship Marketplace Ship & Rig Models Oil & Gas Equipment Marketplace


Worldoils
Events Subsystem
Oil, Gas & Biofuels Events

6 - Sep - 2010 : Berlin
Shale Gas Forum [Map]

7 - Sep - 2010 : New York
2nd Annual Global Derivatives Capital Link Forum [Map]

12 - Sep - 2010 : Montreal
World Energy Congress Montreal 2010 [Map]

13 - Sep - 2010 : Berlin
FAME 2010 [Map]

13 - Sep - 2010 : Houston
North American Oil Trade & Compliance [Map]

13 - Sep - 2010 : Barcelona
4th Annual HSE Excellence Europe [Map]

13 - Sep - 2010 : Stockholm
European Biomass and Bioenergy Forum [Map]

14 - Sep - 2010 : Baku
Gas Infrastructure World Caspian 2010 [Map]

16 - Sep - 2010 : Geneva
Argus European Crude Trading conference [Map]

16 - Sep - 2010 : Shanghai
China FPSO Summit 2010 [Map]

Worldoils
Training Subsystem
Oil, gas & biofuels Training

30 - Aug - 2010 : Dundee
Introduction to International Commercial Arbitration [Map]

2 - Sep - 2010 : Rio de Janeiro
FLNG Technical Masterclass Rio 2010 [Map]

6 - Sep - 2010 : Pau
Principles and Fundamentals of Reservoir Engineering [Map]

6 - Sep - 2010 : London
Specialised Arbitration and Advocacy Skills in International Oil & Gas Disputes [Map]

6 - Sep - 2010 : Astana
Crisis & Emergency Management for the Energy Sector [Map]

8 - Sep - 2010 : Rio de Janeiro
FPSO Rio Training Course 2010 [Map]

9 - Sep - 2010 : Perth
Drilling Essentials for Non-Drilling Professionals [Map]

13 - Sep - 2010 : Houston
Geology for Non-Geologists [Map]

13 - Sep - 2010 : Pau
Drilling for Everyone [Map]

13 - Sep - 2010 : Bandung
Seismic Petrophysics [Map]

Subsea Cameron BOP stack for sale (15,000 psi)

How to buy : Please send an email to mail@worldoils.com with the subject of the email as "New Subsea 15000 psi Blow Out Preventer Stack" or call +65 9776 8837.



 

15K Subsea Cameron BOP Stack for sale - 18 3/4"
15000 psi Cameron BOP stack for sale

 
New equipment for 18-3/4” x 15K subsea BOP stack
 
 
Status
1
Assy – Extension Rod
Set
4
New
2
Removal tool, seal carrier
Set
1
New
3
Ram tray for 18-3/4” 15M ‘TL’ BOP (included in line item 3)
Set
2
New
4
Annular BOP (DL 18-3/4” 10M x 15M bottom)
Set
1
New
5
Annular BOP (DL 18-3/4” 10M x 15M bottom)
Set
1
New
6
Collect connector (Model “HC”, 18-3/4” 10M)
Set
1
New
7
Receiver plate
Set
1
New
8
Lower frame weldment
Set
1
New
9
Weldment stab plate
Set
1
New
10
Subsea accumulators for emergency systems, 80 GAL
Set
10
New
11
Lower stack somponents kit
Sets
1
New
12
Annular retainer lower stack
Sets
1
New
13
Weldment guide funnel
Sets
1
New
14
Split mounting ring half
Nos
4
New
15
Lower stack shipping skid
Sets
1
New
16
LMRP shipping skid
Sets
1
New


17
Split ring half
Nos 2 New
18
Desurger Acc (15 GAL bladder)
Nos 2 New
19
Annular bleed spool (3-1/16”15M flange X flange, 14 feet long)
Set 1 New
20
Spacer spool (3-1/16”15M FLNGD ends, 159” long)
Set 1 New
21
Spacer spool (3-1/16”15M FLNGD ends, 120” long)
Set 1 New
22
Spacer spool (3-1/16”15M FLNGD ends, 69” long)
Set 2 New
23
Spacer spool (3-1/16”15M FLNGD ends, 18” long)
Set 2 New
24
Bracket, guide post
Set 4 New
25
Weldment, guide tube retainer
Set 8 New
26
Misc parts
Set
1
New
27
Flanges for hyd system
Set
1
New
28
Flanges for spools etc
Set
1
New
29
Pipes for spools connection etc
Set
5
New
30
Weldment stack support beam, type 2
Set
1
New
31
Weldment support beam, LMRP
Set
2
New
32
Weldment pod side bumper
Set
2
New
33
Weldment stack support beam, type 1
Set
2
New
34
Gripper post
Set
2
New
35
Weldment stack support beam, type 3
Set
1
New
36
Weldment cross beam
Set
1
New
37
Bottle stand double
Set
4
New
38
Weldment support beam, LMRP
Set
2
New
39
Bottle stand single
Set
2
New
40
Coflexip hose (flanged x flanged, 2” 5M WP, 25 ft long)
Set
2
New
41
Bonnet removal tool (ST lock)
Set
1
New
42
Coflexip hose (flanged x flanged, 3-1/16” 15M WP, 25 ft long)
Set
2
New
43
Bulls eye
Set
2
New
44
Test stump LMRP (connector)
Set
1
New
45
Transponder arm
Set
2
New
46
Re-entry spool (18-3/4” 10M WP, FLNGD BTM x HUB top)
Set
1
New
47
Weldment guide post, top
Set
4
New
48
Weldment guide post, bottom
Set
4
New
49
Weldment guide post, LMRP
Set
4
New
50
Lifting ring (500 ton)
Set
1
New
51
Intermediate work platform
Set
1
New
52
Flex joint (LMRP,5M WP), flanged top
Set
1
New
53
Accoustic valve package
Set
1
Nw
54
Accoustic mini pod assembly
Set
1
New
55
Accoustic control system
Set
1
New
56
Auto shear
Set
1
New
57
Hyd unlock misc
Set
1
New
58
Mini connector (3-1/16”15M WP inc Mtg hardware)
 
2
New
59
MSC valve, straight valve (3-1/16” 15M “F”)
 
2
New
60
Studded cros (5 way 3-1/16” 15M WP)
 
2
New
61
Part kit of material for installation of elephants feet included
 
1
New
62
Ring
 
1
New
63
Ring
 
4
New
64
Flange
 
4
New
65
Funnel
 
4
New
66
Spacer tube
 
5
New
67
Choke/kill adaptor spool 3-1/16”
 
2
New
68
Choke/kill spool 3-1/16” 15M x 22” (sweep)
 
2
New
69
Choke/kill spool 3-1/16” 15M x30” (sweep)
 
2
New
70
Bottom ring for well head connector
 
1
New


 
Used Material to be refurbished
 
 
 
1
Cameron 18-3/4”15M DBL ram T BOP
 
1
As is
2
Cameron 18-3/4”15M DBL ram T BOP extended body
 
1
As is
3
Bonnets for above T BOP’s
 
8
As is
4
Bonnets bolts and nuts for above T BOP’s
 
8
As is
5
Set of blind shear ram blocks
 
1
As is
6
Set of 5-1/2” pipe ram blocks
 
1
As is
7
Set of VBR ram blocks
 
2
As is
8
Double block failsafe valves (3-1/16” 15M)
 
4
As is
9
FMC Connector 918-3/4 15M)
 
1
As is
10
Frame member cross brace (6-1/2” O/D x 58” long)
 
4
As is
11
Securing plates-lower annular to receiver plate
 
4
As is
12
Blind flange (3-1/16” 15M)
 
2
As is
13
Drop-in test sub
 
1
As is
14
Kill line spool piece
 
1
As is
15
Choke line spool piece
 
1
As is
16
Kill line spool piece (20” LG)
 
1
As is
17
Choke line spool piece (27-1/2”LG)
 
1
As is

 
Spares for 18-3/4” x 15K ‘T’ type Cameron double ram BOP
 
 
 
1
644770-02 Bonnet gasket kit
 
8
New
2
702645-32-61 O Ring
 
4
New
3
702645-38-71 O-Ring
 
2
New
4
709635 seal ring
 
4
New
5
614742-05 wear ring
 
4
New
6
709632 seal ring
 
4
New
7
712022 seal ring
 
4
New
8
702645-34-81 O-Ring
 
4
New
9
644381-03 back up ring
 
2
New
10
709633 seal ring
 
2
New
11
70645-42-81 O-Ring
 
4
New
12
70645-42-51 O-Ring
 
3
New
13
712021 seal ring HT
 
4
New
14
644355-01 spacer ring
 
2
New
15
644356-01 retainer ring
 
2
New
16
702645-45-31 O-Ring
 
2
New
17
644491-02 seal sub
 
2
New
18
702645-21-41 O-Ring
 
8
New
19
615684-02 HP plug
 
12
New
20
702645-11-31 O-Ring
 
8
New
21
708490-01 quick disconnect ¼” male
 
2
New
22
644438-01 inner seal F/hydraulic bonnet nut
 
8
New
23
644439-01 inner seal F/hydraulic bonnet nut
 
8
New
24
702645-37-71 O-Ring
 
8
New
25
709493 check valve
 
2
New
26
709636 retainer ring
 
8
New
27
644301-01 ram change piston open
 
1
New
28
644301-02 ram change piston open
 
1
New
29
615685-01 cylinder ram change
 
1
New
30
615711-01 gland
 
1
New
31
615712-01 retainer ring ram change
 
2
New
32
702585-14-00-20 cap screw
 
24
New
33
644359-01 spacer ring hydraulic bonnet stud
 
8
New
34
615709-01 piston hydraulic bonnet stud
 
2
New
35
644358-03-00-01 bonnet insert gasket
 
2
New
36
709503 retainer ring
 
2
New

The weight of the 15K stack will be well within 250 Tons.

All the equipment offered are available in Asia , as is,  and the condition / bill of materials / quantities 
are as per the above list.

Document packages that will be offered satisfy all requirements under
API 6A/16A/ISO9001: 208/OHSAS18 001:2007, all tests are carried out by
a workshop with all necessary approvals API/DNV/ISO etc...

Price of the 18 3/4" 15K stack equipment as per the above list  is US$26,500,000


---------------------------------------------------------------------------------------------------------
Search words :
15000 psi Cameron BOP stack for sale
15k BOP stack for sale
18 3/4" Cameron Subsea BOP stack for sale
15000psi Subsea BOP Stack For Sale
15000 psi Cameron BOP Stack

---------------------------------------------------------------------------------------------------------

Worldoils Oil & Gas Jobs
Oil Careers on Worldoils

Maintenance Manager : Swift Worldwide Resources

Senior Operations Completions Engineer : Swift Worldwide Resources

Mechanical/Piping Project Engineer : Swift Worldwide Resources

Document Control : Swift Worldwide Resources

Senior Lead Estimator : Swift Worldwide Resources

Process Engineer : Swift Worldwide Resources

Manifolds Project Engineer : Swift Worldwide Resources

Instrument Designer : Swift Worldwide Resources

Maintenance Supervisor : Swift Worldwide Resources

Scheduler- Pipelines : Swift Worldwide Resources

Worldoils Oil Forums
Oil, gas & Discussion Threads

2 - Sep - 2010 : Alternate Energy Sources

31 - Aug - 2010 : Oil & Gas Search Engine

20 - Jul - 2010 : 'A Whale' superskimmer out of Gulf oil spill response

14 - Jul - 2010 : Oil Forecast for 2011 and 2012

1 - Jul - 2010 : Failing Blowout Preventers

27 - May - 2010 : Mineral Rights Information Site and Forum

16 - May - 2010 : 3rd CBM & Unconventional Gas Summit in Hong Kong

16 - May - 2010 : 4th FLNG Asia Pacific Summit in Singapore, Singapore

16 - May - 2010 : International Oil & Gas Conference and Exhibition in China in Beijing 2010

9 - May - 2010 : Pressurised Natural Gas


...........................................................................................................................................................................................................
www.worldoils.com |  Disclaimer
email : mail@worldoils.com