Oil & Gas land drilling rigs for sale, Land drilling rigs for sale
Worldoils
Home Biofuels Oil & Gas Directory Glossary Research Training News Newsletter Events Oil & Gas Jobs Contact Water Well Rigs Boats
Land Drilling Rigs Jackup Rigs LDPE Recycling Oilfield Container Camps Offshore Accommodation Steel Houses Mini Submarines Oil & Gas Equipment Marketplace
Home Biofuels Oil & Gas Directory Glossary Research Training News
Newsletter Events Oil & Gas Jobs Water Well Rigs Land Drilling Rigs
Jackup Rigs Boats LDPE Recycling Oilfield Container Camps Crude Oil Price History
Steel Houses Mini Submarines Oil & Gas Equipment Marketplace Contact
Home Jackup Rigs LDPE Recycling Boats
News Water Well Rigs Land Drilling Rigs
Mini Submarines Events Steel Houses
Oilfield Container Camps Oil & Gas Directory
Oil & Gas Equipment Marketplace Contact


 

If you cannot find the new or used offshore rigs, vessels or equipment of any type, size or make that you are looking for, please send us an email to and we shall offer you.


 

If you cannot find the new or used offshore rigs, vessels or equipment of any type, size or make that you are looking for, please send us an email to and we shall offer you.


Offshore Rig Construction Market to 2015 and Current Rig Deployment Scenario
Worldoils Oil, Gas and Offshore Marketplace    

Equipment ID   : 1151
Equipment name   : Offshore Rig Construction Market to 2015 and Current Rig Deployment Scenario
Category   : Research Reports
Specifications   : Name of the Report :
Offshore Rig Construction Market to 2015 and Current
Rig Deployment Scenario - Acquisition of Rivals a Prominent
Strategic Option

Published Date : 31-Oct-2011
No. of pages : 103

Table of Contents : 
1 Table of Contents
1 Table of Contents… 4
1.1 List of Tables… 6
1.2 List of Figures… 7
2 Future of the Offshore Rig Construction Market and Current
Rig Deployment Scenario – Introduction… 8
2.1 Report Guidance… 8
3 Offshore Rig Construction Market – Overview… 9
3.1 Significance of the Offshore Rig Construction Industry as
Part of the Value Chain in the Upstream Oil and Gas Sector… 9
3.2 Key Segments of the Offshore Rig Construction Industry… 9
3.2.1 Jack-Up Rigs… 9
3.2.2 Semisubmersibles… 9
3.2.3 Drillships… 9
3.2.4 Fixed Platforms… 9
3.2.5 Compliant Towers… 10
3.2.6 Tension Leg Platforms (TLPs)… 10
3.2.7 Spar Platforms… 10
3.2.8 Barges… 10
3.2.9 Tender Rigs… 10
3.2.10 Premium and Ultra-Premium Jack-Up Rigs… 10
4 Offshore Rig Construction Market to 2015 – Geographic and
Segment Analysis… 11
4.1 Geographic Scenario of the Global Offshore Rig Construction
Industry… 11
4.2 Segmental Analysis of the Global Offshore Rig Construction
Industry… 12
5 Key Trends and Challenges in the Offshore Rig Construction 
Industry… 14
5.1 Key Trends of the Offshore Rig Construction Industry… 14
5.1.1 Offshore Rig Contractors are Acquiring Rivals as a Beneficial
Business Strategy Due to Increasing Cost of Rig Manufacturing and
the Poor Credit Situation… 14
5.1.2 Offshore Upstream Sector is Expected to Record a Significant
Rise in Jack-Up Rig Construction Activity Due to Increasing Demand
for Shallow Water Offshore Development… 14
5.1.3 Rapidly Growing Demand for Premium and Ultra-Premium Jack-Ups
will Create a Shortage of Premium Jack-Ups by 2015… 14
5.1.4 Improved Risk Assessment Will Reduce Costs and Time Delay for
Rig Construction Projects… 15
5.1.5 Rig Construction is Expected to be Strengthened by the South
East Asian Rig Construction Industry… 15
5.1.6 Rise in Deep and Ultra-Deep Water Drilling in Brazil is Expected
to Strengthen the Drillship Construction Industry… 15
5.2 Major Challenges of the Offshore Rig Construction Industry… 16
5.2.1 Cost Dynamics are Proving to be Unfavorable to the Brazilian
Offshore Rig Construction Industry Due to Inadequate Workforce
Training and the Unattractive Labor Market… 16
5.2.2 Technological Developments in Offshore Rig Construction could
Lead to Successful Exploration and Production in Geographically
Challenging Areas… 16
5.2.3 Stricter Offshore Regulations for Safety and Environmental
Protection Will Lead to Technological Modifications in the
Engineering Design of Offshore Rigs… 16
6 Offshore Rig Construction Industry Forecasts to 2015 and Current
Status of Worldwide Offshore Fleet in Operation… 17
6.1 Offshore Rig Construction Newbuild Expenditure Forecasts to
2015… 17
6.2 Offshore Rig Construction Newbuild Expenditure Forecasts to
2015, by Segment… 19
6.2.1 Offshore Rig Construction Newbuild Expenditure Forecasts to
2015, Jack-Up Rigs… 19
6.2.2 Offshore Rig Construction Newbuild Expenditure Forecasts to
2015, Semisubmersible Rigs… 23
6.2.3 Offshore Rig Construction Newbuild Expenditure Forecasts to
2015, Drillships… 25
6.3 Offshore Rig Order Costs, Forecasts to 2015, by Segment… 27
6.3.1 Offshore Rig Order Costs, Forecasts to 2015, Jack-Up Rigs… 27
6.3.2 Offshore Rig Order Costs, Forecasts to 2015, Semisubmersible
Rigs… 31
6.3.3 Offshore Rig Order Costs, Forecasts to 2015, Drillships… 32
6.4 Newbuild Rig Orders by Offshore Drilling Contractors… 34
6.5 Pending Rig Orders by Rig Segment and Rig Availability in
Future… 39
6.5.1 Pending Rig Orders and Rig Availability, Jack-Up Rigs,
Updated August 2011… 39
6.5.2 Pending Rig Orders and Rig Availability, Semisubmersibles,
Updated August 2011… 44
6.5.3 Pending Rig Orders and Rig Availability, Drillships,
Updated August 2011… 46
6.5.4 Pending Rig Orders and Rig Availability, Tender Rigs,
Updated August 2011… 50
6.5.5 Pending Rig Orders and Rig Availability, Inland Barges,
Updated August 2011… 51
6.6 Current Status of Worldwide Offshore Rigs and Expected
Newbuilds… 51
6.6.1 Current Status, Number of Worldwide Offshore Rigs and
Expected Newbuilds… 51
6.7 Current Status of Worldwide Fleet in Operation by Individual
Offshore Structure and Type, and Deployment Location… 56
6.7.1 Current Status, Worldwide Fleet in Operation, Jack-Up Rigs,
by Structure Name, Deployment Location and Region… 56
6.7.2 Current Status, Worldwide Fleet in Operation, Semisubmersible
Rigs, by Structure Name, Deployment Location and Region… 73
6.7.3 Current Status, Worldwide Fleet in Operation, Drillships,
by Structure Name, Deployment Location and Region… 79
6.7.4 Current Status, Worldwide Fleet in Operation, Inland Barges,
by Structure Name, Deployment Location and Region… 82
6.7.5 Current Status, Worldwide Fleet in Operation, Drill Barges,
by Structure Name, Deployment Location and Region… 85
6.7.6 Current Status, Worldwide Fleet in Operation, Tender Rigs,
by Structure Name, Deployment Location and Region… 87
6.7.7 Current Status, Worldwide Fleet in Operation, Platform Rigs,
by Structure Name, Deployment Location and Region… 88
6.7.8 Current Status, Worldwide Fleet in Operation, Submersibles,
by Structure Name, Deployment Location and Region… 96
6.8 Expected Newbuild Offshore Rigs, by Country of Manufacturing
Shipyard… 97
6.8.1 Expected Newbuild Jack-Up Rigs, by Country of Manufacturing
Shipyard… 97
6.8.2 Expected Newbuild Semisubmersible Rigs, by Country of
Manufacturing Shipyard… 98
6.8.3 Expected Newbuild Drillships, by Country of Manufacturing
Shipyard… 99
6.8.4 Expected Newbuild Inland Barges, by Country of Manufacturing
Shipyard… 100
6.8.5 Expected Newbuild Tender Rigs, by Country of Manufacturing
Shipyard… 100
 
List of Tables

1.1 List of Tables
Table 1: Offshore Rig Construction Industry, Global Revenue (%),
2010… 11
Table 2: Global Offshore Rig Construction Industry, Segment
Analysis, Number of Rigs, 2011–2015… 13
Table 3: Total Annual Newbuild Construction Expenditure Forecasts
($bn), 2000–2015… 18
Table 4: Newbuild Jack-Up Rig Construction Expenditure Forecasts
($bn), 2000–2015… 20
Table 5: Newbuild Jack-Up Rig Construction Expenditure Forecasts,
Standard Segment ($bn), 2000–2015… 21
Table 6: Newbuild Jack-Up Rig Construction Expenditure Forecasts,
Premium/Ultra-Premium Segment ($bn), 2000–2015… 22
Table 7: Newbuild Semisubmersible Rig Construction Expenditure
Forecasts ($bn), 2000–2015… 24
Table 8: Newbuild Drillship Construction Expenditure Forecasts
($bn), 2000–2015… 26
Table 9: Jack-Up (Standard and Premium/Ultra-Premium Segment
Combined) Rig Order Cost ($m Per Rig), 2000–2015… 28
Table 10: Standard Jack-Up Rig Order Cost ($m Per Rig),
2000–2015… 29
Table 11: Premium and Ultra-Premium Jack-Up Rig Order Cost
($m Per Rig), 2000–2015… 30
Table 12: Semisubmersible Rig Order Cost ($m Per Rig),
2000–2015… 31
Table 13: Drillship Order Cost ($m Per Rig), 2000–2015… 33
Table 14: Newbuild Rig Orders, Updated August 2011… 34
Table 15: Newbuild Rig Construction Orders by Offshore Drilling
Contractor, Updated August 2011… 35
Table 16: Worldwide Jack-Ups Construction Survey, Updated August
2011… 39
Table 17: Expected Number of Jack-Ups to be Delivered, by Year… 43
Table 18: Worldwide Semisubmersibles Construction Survey,
Updated August 2011… 44
Table 19: Expected Number of Semisubmersibles to be Delivered,
by Year… 45
Table 20: Worldwide Drillships Construction Survey, Updated August
2011… 46
Table 21: Expected Number of Drillships to be Delivered, by Year… 49
Table 22: Worldwide Tender Rigs Construction Survey, Updated August
2011… 50
Table 23: Expected Number of Tender Rigs to be Delivered, by Year… 51
Table 24: Worldwide Inland Barges Construction Survey, Updated August
2011… 51
Table 25: Offshore Rigs and Expected Newbuilds, as of August 2011… 51
Table 26: Global In-Service Rig Fleet Status as of August 2011,
by Rig Type… 52
Table 27: Number of Offshore Rigs, by Current Status and Rig Type… 54
Table 28: Current Status, Worldwide Fleet in Operation, Jack-Up Rigs,
by Structure Name, Deployment Location and Region… 56
Table 29: Current Status, Worldwide Fleet in Operation, Semisubmersible
Rigs, by Structure Name, Deployment Location and Region… 73
Table 30: Current Status, Worldwide Fleet in Operation, Drillships,
by Structure Name, Deployment Location and Region… 79
Table 31: Current Status, Worldwide Fleet in Operation, Inland Barges,
by Structure Name, Deployment Location and Region… 82
Table 32: Current Status, Worldwide Fleet in Operation, Drill Barges,
by Structure Name, Deployment Location and Region… 85
Table 33: Current Status, Worldwide Fleet in Operation, Tender Rigs,
by Structure Name, Deployment Location and Region… 87
Table 34: Current Status, Worldwide Fleet in Operation, Platform Rigs,
by Structure Name, Deployment Location and Region… 88
Table 35: Current Status, Worldwide Fleet in Operation, Submersibles,
by Structure Name, Deployment Location and Region… 96
Table 36: Expected Newbuild Jack-Up Rigs, by Country of Manufacturing
Shipyard… 97
Table 37: Expected Newbuild Semisubmerible Rigs, by Country of
Manufacturing Shipyard… 98
Table 38: Expected Newbuild Drillships, by Country of Manufacturing
Shipyard… 99
Table 39: Expected Newbuild Inland Barges, by Country of Manufacturing
Shipyard… 100
Table 40: Expected Newbuild Tender Rigs, by Country of Manufacturing
Shipyard… 100
Table 41: Abbreviations… 102
 
List of Figures

1.2 List of Figures
Figure 1: Offshore Rig Construction Industry, Global Revenue
(%), 2010… 11
Figure 2: Global Offshore Rig Construction Industry, Segment
Analysis, Number of Rigs, 2011–2015… 12
Figure 3:Total Annual Newbuild Construction Expenditure Forecasts
($bn), 2000–2015… 17
Figure 4: Newbuild Jack-Up Rig Construction Expenditure Forecasts
($bn), 2000–2015… 19
Figure 5: Newbuild Jack-Up Rig Construction Expenditure Forecasts,
Standard Segment ($bn), 2000–2015… 21
Figure 6: Newbuild Jack-Up Rig Construction Expenditure Forecasts,
Premium/Ultra-Premium Segment ($bn), 2000–2015… 22
Figure 7: Newbuild Semisubmersible Rig Construction Expenditure
Forecasts ($bn), 2000–2015… 23
Figure 8: Newbuild Drillship Construction Expenditure Forecasts
($bn), 2000–2015… 25
Figure 9: Jack-Up (Standard and Premium/Ultra-Premium Segment Combined)
Rig Order Cost ($m Per Rig), 2000–2015… 27
Figure 10: Standard Jack-Up Rig Order Cost ($m Per Rig), 2000–2015… 29
Figure 11: Premium and Ultra-Premium Jack-Up Rig Order Cost
($m Per Rig), 2000–2015… 30
Figure 12: Semisubmersible Rig Order Cost ($m Per Rig), 2000–2015… 31
Figure 13: Drillship Order Cost ($m Per Rig), 2000–2015… 32
Figure 14: Newbuild Rig Orders, Updated August 2011… 34
Figure 15: Expected Number of Jack-Ups to be Delivered, by Year… 43
Figure 16: Expected Number of Semisubmersibles to be Delivered,
by Year… 45
Figure 17: Expected Number of Drillships to be Delivered, by Year… 49
Figure 18: Expected Number of Tender Rigs to be Delivered, by Year… 50
Figure 19: Global In-Service Rig Fleet Status as of August 2011, by
Rig Type… 52
Figure 20: Global Newbuild Rig Fleet Status as of August 2011,
by Rig Type… 53
Figure 21: Number of Offshore Rigs, by Current Status and Rig Type… 53
Figure 22: Expected Newbuild Jack-Up Rigs, by Country of Manufacturing
Shipyard… 97
Figure 23: Expected Newbuild Semisubmerible Rigs, by Country of
Manufacturing Shipyard… 98
Figure 24: Expected Newbuild Drillships, by Country of Manufacturing
Shipyard… 99
Figure 25: Expected Newbuild Tender Rigs, by Country of Manufacturing
Shipyard… 100

Summary

A leading business intelligence provider, has released
its latest research, “Offshore Rig Construction Market to 2015 and
Current Rig Deployment Scenario - Acquisition of Rivals a Prominent
Strategic Option”. The study, which is an offering from the company’s
Energy Research Group, provides an in-depth analysis of the global
offshore rig construction market and highlights various concerns, key
trends and challenges, along with major companies in the industry. The
report provides forecasts for the offshore rig construction industry
to 2015. It also provides segmental forecasts of the offshore rig
construction market worldwide by rig type, and provides comprehensive
data on current offshore rigs deployed globally, by rig type. The report
also provides in-depth information on new build rig orders by major
offshore drilling contractors, by country of rig manufacturing shipyard,
and expected new builds and their expected deployment time. The report
is built using data and information sourced from proprietary databases,
primary and secondary research, and in-house analysis by this
team of industry experts.

As most countries which possess commercial potential in terms of their
offshore reserves seek to achieve energy self-sufficiency, the offshore
exploration and production industry is expected to make significant
investments in the discovery and development of new offshore reserves.
In turn, this will lead to infrastructure investments by exploration
and production companies in the form of new build offshore rigs, particularly
for untapped shallow water regions with exploration potential. Subsequently,
offshore rig construction expenditure is expected to rise from 2011–2015.

As shallow water drilling activity is expected to substantially rise, the
business potential for harshenvironment and premium and ultra-premium
jack-up rig construction companies is expected to be strong. Also, at present,
rig contractors prefer to acquire rival companies as part of their business
strategy in order to gain a competitive edge.

Scope


The report provides in-depth analysis of the major factors affecting the
offshore rig construction industry worldwide. Its scope includes -
- Overview and analysis of the global offshore rig construction market to 2015
- Analysis of the historical trends and forecasts to 2015
- Segmental forecasts of offshore rig construction expenditure, by rig type
- Country-specific data with regard to new builds
- Comprehensive data of currently deployed offshore rigs, by rig type
- Analysis of the opportunities and challenges in the global offshore rig
construction industry

Reasons to buy

- Develop business strategies with the help of specific insights about the global 
enhanced production services industry. 
- Identify key trends and challenges in the global enhanced production services 
industry.
- Increase future revenues and profitability with the help of insights on the 
expected demand-supply scenario of specific sub-segments of the enhanced 
production services.
- Benchmark your operations and strategies using key insights from the 
major current and expected business developments with regards to the 
enhanced production services industry.

Single User Price : $3,500
Site License Price : $7,000
Enterprisewide Price (Global Site License) : $10,500
 

Disclaimer
All Rights Reserved.

No part of this publication may be reproduced, stored in a retrieval system or transmitted
in any form by any means, electronic, mechanical, photocopying, recording or otherwise,
without the prior permission of the publisher.

The facts of this report are believed to be correct at the time of publication but cannot be
guaranteed. Please note that the findings, conclusions and recommendations that the
publisher delivers will be based on information gathered in good faith from both primary
and secondary sources, whose accuracy we are not always in a position to guarantee.
As such the publisher accept no liability whatever for actions taken based on any
information that may subsequently prove to be incorrect.

To order this report, please send an email to mail@worldoils.com

------------------------------------------------------------------------------------------------------------
Search words (for official use only) :

Offshore Rig Construction Market – Overview
Key Segments of the Offshore Rig Construction Industry
Premium and Ultra-Premium Jack-Up Rigs
Offshore Rig Order Costs, Forecasts to 2015, by Segment
Geographic Scenario of the Global Offshore Rig Construction Industry
Key Trends of the Offshore Rig Construction Industry
Offshore Rig Construction Newbuild Expenditure Forecasts

----------------------------------------------------------------------------------------------------------

     
Worldoils Oil, Gas and Offshore Marketplace
Worldoils Oil, Gas and Offshore Marketplace - Offshore Rig Construction Market to 2015 and Current Rig Deployment Scenario
Images
 
Offshore Rig Construction Market to 2015 and Current  Rig Deployment Scenario
 

Send an email to Worldoils
Note : Fields marked by (*) are mandatory.
Email to:  Worldoils
For equipment:  Offshore Rig Construction Market to 2015 and Current Rig Deployment Scenario
Category:  Research Reports
Your name:  *
Your company:  *
Your email address:  *
Your phone no.:  *
Your message:  *
Security code:
* (Use capital letters only)

 

The information contained herein is believed to be accurate but has not been verified. This equipment is subject to prior sale and sold “where-is as-is” with no warranties from Worldoils Pte Ltd or the Seller expressed or implied.
Worldoils Oil, Gas and Offshore Marketplace    Worldoils Oil, Gas and Offshore Marketplace


Vessel Monitoring Software
Offsore Rig Monitoring Software
Mobile Hospitals
Field Hospitals
LDPE Recycling

Live Monitoring of Ships and rigs

Oilfield Container Camps

Mini Submarine

Ring Maintenance Software
Best Project Tracking & Control Software

Used Land Rigs For Sale


Mining Container Camps

Oil & Gas Industry Machinery & Equipment Marketplace
Gardner Denver 3000 Drilling Rig - For Sale
Platform Supply Vessel for Sale
Ingersoll-Rand TH60 Drilling Rig for Sale
Schramm T64HB Drill Rig For Sale
Schramm T450BH Driling Rig - 2004 Built - For Sale
Gardner Denver 2000 Drilling Rig for Sale
Schramm T130XD Drilling Rig - 2007 Built - For Sale
Reichdrill T650 BH Drilling Rig for Sale
Drilling Rig - 1500hp - For Sale
Drilling Rig - 1500hp - For Sale
Ingersoll-Rand T4W Drilling Rig for Sale
Towing Tug for Sale
Towing Tug for Sale
Anchor Handling Tug For Sale
Driltech D40K Drill Rig For Sale
Crew Supply Vessel for Sale
Towing Tug for Sale
Crew Supply Vessel for Sale
Service King 775 Carrier Mounted Drilling Rig For Sale
Rig Master E90 DC Drilling Rig For Sale
Schramm T685 Drill Rig For Sale
IDECO H44 Truck Mounted Drilling and Work-Over Rig for Sale
Ingersoll-Rand T4W Drill Rig for Sale
Cantilever Triple Drilling Rig For Sale
Cantilever Triple Drilling Rig For Sale
Worldoils Land Rigs Market
1000hp Land Drilling Rigs
1500hp Rotary Land Drilling Rigs
2000hp Rotary Land Drilling Rigs
3000hp Rotary Land Drilling Rigs
Workover Land Rigs
Carrier Mounted Land Drilling Rigs
Trailer Mounted Land Drilling Rigs

 

 

If you cannot find the new or used offshore rigs, vessels or equipment of any type, size or make that you are looking for, please send us an email to and we shall offer you.

Offshore Rig Construction Market to 2015 and Current Rig Deployment Scenario
Worldoils Oil, Gas and Offshore Marketplace    Worldoils Oil, Gas and Offshore Marketplace

Equipment ID   : 1151
Equipment name   : Offshore Rig Construction Market to 2015 and Current Rig Deployment Scenario
Category   : Research Reports
Specifications   : Name of the Report :
Offshore Rig Construction Market to 2015 and Current
Rig Deployment Scenario - Acquisition of Rivals a Prominent
Strategic Option

Published Date : 31-Oct-2011
No. of pages : 103

Table of Contents : 
1 Table of Contents
1 Table of Contents… 4
1.1 List of Tables… 6
1.2 List of Figures… 7
2 Future of the Offshore Rig Construction Market and Current
Rig Deployment Scenario – Introduction… 8
2.1 Report Guidance… 8
3 Offshore Rig Construction Market – Overview… 9
3.1 Significance of the Offshore Rig Construction Industry as
Part of the Value Chain in the Upstream Oil and Gas Sector… 9
3.2 Key Segments of the Offshore Rig Construction Industry… 9
3.2.1 Jack-Up Rigs… 9
3.2.2 Semisubmersibles… 9
3.2.3 Drillships… 9
3.2.4 Fixed Platforms… 9
3.2.5 Compliant Towers… 10
3.2.6 Tension Leg Platforms (TLPs)… 10
3.2.7 Spar Platforms… 10
3.2.8 Barges… 10
3.2.9 Tender Rigs… 10
3.2.10 Premium and Ultra-Premium Jack-Up Rigs… 10
4 Offshore Rig Construction Market to 2015 – Geographic and
Segment Analysis… 11
4.1 Geographic Scenario of the Global Offshore Rig Construction
Industry… 11
4.2 Segmental Analysis of the Global Offshore Rig Construction
Industry… 12
5 Key Trends and Challenges in the Offshore Rig Construction 
Industry… 14
5.1 Key Trends of the Offshore Rig Construction Industry… 14
5.1.1 Offshore Rig Contractors are Acquiring Rivals as a Beneficial
Business Strategy Due to Increasing Cost of Rig Manufacturing and
the Poor Credit Situation… 14
5.1.2 Offshore Upstream Sector is Expected to Record a Significant
Rise in Jack-Up Rig Construction Activity Due to Increasing Demand
for Shallow Water Offshore Development… 14
5.1.3 Rapidly Growing Demand for Premium and Ultra-Premium Jack-Ups
will Create a Shortage of Premium Jack-Ups by 2015… 14
5.1.4 Improved Risk Assessment Will Reduce Costs and Time Delay for
Rig Construction Projects… 15
5.1.5 Rig Construction is Expected to be Strengthened by the South
East Asian Rig Construction Industry… 15
5.1.6 Rise in Deep and Ultra-Deep Water Drilling in Brazil is Expected
to Strengthen the Drillship Construction Industry… 15
5.2 Major Challenges of the Offshore Rig Construction Industry… 16
5.2.1 Cost Dynamics are Proving to be Unfavorable to the Brazilian
Offshore Rig Construction Industry Due to Inadequate Workforce
Training and the Unattractive Labor Market… 16
5.2.2 Technological Developments in Offshore Rig Construction could
Lead to Successful Exploration and Production in Geographically
Challenging Areas… 16
5.2.3 Stricter Offshore Regulations for Safety and Environmental
Protection Will Lead to Technological Modifications in the
Engineering Design of Offshore Rigs… 16
6 Offshore Rig Construction Industry Forecasts to 2015 and Current
Status of Worldwide Offshore Fleet in Operation… 17
6.1 Offshore Rig Construction Newbuild Expenditure Forecasts to
2015… 17
6.2 Offshore Rig Construction Newbuild Expenditure Forecasts to
2015, by Segment… 19
6.2.1 Offshore Rig Construction Newbuild Expenditure Forecasts to
2015, Jack-Up Rigs… 19
6.2.2 Offshore Rig Construction Newbuild Expenditure Forecasts to
2015, Semisubmersible Rigs… 23
6.2.3 Offshore Rig Construction Newbuild Expenditure Forecasts to
2015, Drillships… 25
6.3 Offshore Rig Order Costs, Forecasts to 2015, by Segment… 27
6.3.1 Offshore Rig Order Costs, Forecasts to 2015, Jack-Up Rigs… 27
6.3.2 Offshore Rig Order Costs, Forecasts to 2015, Semisubmersible
Rigs… 31
6.3.3 Offshore Rig Order Costs, Forecasts to 2015, Drillships… 32
6.4 Newbuild Rig Orders by Offshore Drilling Contractors… 34
6.5 Pending Rig Orders by Rig Segment and Rig Availability in
Future… 39
6.5.1 Pending Rig Orders and Rig Availability, Jack-Up Rigs,
Updated August 2011… 39
6.5.2 Pending Rig Orders and Rig Availability, Semisubmersibles,
Updated August 2011… 44
6.5.3 Pending Rig Orders and Rig Availability, Drillships,
Updated August 2011… 46
6.5.4 Pending Rig Orders and Rig Availability, Tender Rigs,
Updated August 2011… 50
6.5.5 Pending Rig Orders and Rig Availability, Inland Barges,
Updated August 2011… 51
6.6 Current Status of Worldwide Offshore Rigs and Expected
Newbuilds… 51
6.6.1 Current Status, Number of Worldwide Offshore Rigs and
Expected Newbuilds… 51
6.7 Current Status of Worldwide Fleet in Operation by Individual
Offshore Structure and Type, and Deployment Location… 56
6.7.1 Current Status, Worldwide Fleet in Operation, Jack-Up Rigs,
by Structure Name, Deployment Location and Region… 56
6.7.2 Current Status, Worldwide Fleet in Operation, Semisubmersible
Rigs, by Structure Name, Deployment Location and Region… 73
6.7.3 Current Status, Worldwide Fleet in Operation, Drillships,
by Structure Name, Deployment Location and Region… 79
6.7.4 Current Status, Worldwide Fleet in Operation, Inland Barges,
by Structure Name, Deployment Location and Region… 82
6.7.5 Current Status, Worldwide Fleet in Operation, Drill Barges,
by Structure Name, Deployment Location and Region… 85
6.7.6 Current Status, Worldwide Fleet in Operation, Tender Rigs,
by Structure Name, Deployment Location and Region… 87
6.7.7 Current Status, Worldwide Fleet in Operation, Platform Rigs,
by Structure Name, Deployment Location and Region… 88
6.7.8 Current Status, Worldwide Fleet in Operation, Submersibles,
by Structure Name, Deployment Location and Region… 96
6.8 Expected Newbuild Offshore Rigs, by Country of Manufacturing
Shipyard… 97
6.8.1 Expected Newbuild Jack-Up Rigs, by Country of Manufacturing
Shipyard… 97
6.8.2 Expected Newbuild Semisubmersible Rigs, by Country of
Manufacturing Shipyard… 98
6.8.3 Expected Newbuild Drillships, by Country of Manufacturing
Shipyard… 99
6.8.4 Expected Newbuild Inland Barges, by Country of Manufacturing
Shipyard… 100
6.8.5 Expected Newbuild Tender Rigs, by Country of Manufacturing
Shipyard… 100
 
List of Tables

1.1 List of Tables
Table 1: Offshore Rig Construction Industry, Global Revenue (%),
2010… 11
Table 2: Global Offshore Rig Construction Industry, Segment
Analysis, Number of Rigs, 2011–2015… 13
Table 3: Total Annual Newbuild Construction Expenditure Forecasts
($bn), 2000–2015… 18
Table 4: Newbuild Jack-Up Rig Construction Expenditure Forecasts
($bn), 2000–2015… 20
Table 5: Newbuild Jack-Up Rig Construction Expenditure Forecasts,
Standard Segment ($bn), 2000–2015… 21
Table 6: Newbuild Jack-Up Rig Construction Expenditure Forecasts,
Premium/Ultra-Premium Segment ($bn), 2000–2015… 22
Table 7: Newbuild Semisubmersible Rig Construction Expenditure
Forecasts ($bn), 2000–2015… 24
Table 8: Newbuild Drillship Construction Expenditure Forecasts
($bn), 2000–2015… 26
Table 9: Jack-Up (Standard and Premium/Ultra-Premium Segment
Combined) Rig Order Cost ($m Per Rig), 2000–2015… 28
Table 10: Standard Jack-Up Rig Order Cost ($m Per Rig),
2000–2015… 29
Table 11: Premium and Ultra-Premium Jack-Up Rig Order Cost
($m Per Rig), 2000–2015… 30
Table 12: Semisubmersible Rig Order Cost ($m Per Rig),
2000–2015… 31
Table 13: Drillship Order Cost ($m Per Rig), 2000–2015… 33
Table 14: Newbuild Rig Orders, Updated August 2011… 34
Table 15: Newbuild Rig Construction Orders by Offshore Drilling
Contractor, Updated August 2011… 35
Table 16: Worldwide Jack-Ups Construction Survey, Updated August
2011… 39
Table 17: Expected Number of Jack-Ups to be Delivered, by Year… 43
Table 18: Worldwide Semisubmersibles Construction Survey,
Updated August 2011… 44
Table 19: Expected Number of Semisubmersibles to be Delivered,
by Year… 45
Table 20: Worldwide Drillships Construction Survey, Updated August
2011… 46
Table 21: Expected Number of Drillships to be Delivered, by Year… 49
Table 22: Worldwide Tender Rigs Construction Survey, Updated August
2011… 50
Table 23: Expected Number of Tender Rigs to be Delivered, by Year… 51
Table 24: Worldwide Inland Barges Construction Survey, Updated August
2011… 51
Table 25: Offshore Rigs and Expected Newbuilds, as of August 2011… 51
Table 26: Global In-Service Rig Fleet Status as of August 2011,
by Rig Type… 52
Table 27: Number of Offshore Rigs, by Current Status and Rig Type… 54
Table 28: Current Status, Worldwide Fleet in Operation, Jack-Up Rigs,
by Structure Name, Deployment Location and Region… 56
Table 29: Current Status, Worldwide Fleet in Operation, Semisubmersible
Rigs, by Structure Name, Deployment Location and Region… 73
Table 30: Current Status, Worldwide Fleet in Operation, Drillships,
by Structure Name, Deployment Location and Region… 79
Table 31: Current Status, Worldwide Fleet in Operation, Inland Barges,
by Structure Name, Deployment Location and Region… 82
Table 32: Current Status, Worldwide Fleet in Operation, Drill Barges,
by Structure Name, Deployment Location and Region… 85
Table 33: Current Status, Worldwide Fleet in Operation, Tender Rigs,
by Structure Name, Deployment Location and Region… 87
Table 34: Current Status, Worldwide Fleet in Operation, Platform Rigs,
by Structure Name, Deployment Location and Region… 88
Table 35: Current Status, Worldwide Fleet in Operation, Submersibles,
by Structure Name, Deployment Location and Region… 96
Table 36: Expected Newbuild Jack-Up Rigs, by Country of Manufacturing
Shipyard… 97
Table 37: Expected Newbuild Semisubmerible Rigs, by Country of
Manufacturing Shipyard… 98
Table 38: Expected Newbuild Drillships, by Country of Manufacturing
Shipyard… 99
Table 39: Expected Newbuild Inland Barges, by Country of Manufacturing
Shipyard… 100
Table 40: Expected Newbuild Tender Rigs, by Country of Manufacturing
Shipyard… 100
Table 41: Abbreviations… 102
 
List of Figures

1.2 List of Figures
Figure 1: Offshore Rig Construction Industry, Global Revenue
(%), 2010… 11
Figure 2: Global Offshore Rig Construction Industry, Segment
Analysis, Number of Rigs, 2011–2015… 12
Figure 3:Total Annual Newbuild Construction Expenditure Forecasts
($bn), 2000–2015… 17
Figure 4: Newbuild Jack-Up Rig Construction Expenditure Forecasts
($bn), 2000–2015… 19
Figure 5: Newbuild Jack-Up Rig Construction Expenditure Forecasts,
Standard Segment ($bn), 2000–2015… 21
Figure 6: Newbuild Jack-Up Rig Construction Expenditure Forecasts,
Premium/Ultra-Premium Segment ($bn), 2000–2015… 22
Figure 7: Newbuild Semisubmersible Rig Construction Expenditure
Forecasts ($bn), 2000–2015… 23
Figure 8: Newbuild Drillship Construction Expenditure Forecasts
($bn), 2000–2015… 25
Figure 9: Jack-Up (Standard and Premium/Ultra-Premium Segment Combined)
Rig Order Cost ($m Per Rig), 2000–2015… 27
Figure 10: Standard Jack-Up Rig Order Cost ($m Per Rig), 2000–2015… 29
Figure 11: Premium and Ultra-Premium Jack-Up Rig Order Cost
($m Per Rig), 2000–2015… 30
Figure 12: Semisubmersible Rig Order Cost ($m Per Rig), 2000–2015… 31
Figure 13: Drillship Order Cost ($m Per Rig), 2000–2015… 32
Figure 14: Newbuild Rig Orders, Updated August 2011… 34
Figure 15: Expected Number of Jack-Ups to be Delivered, by Year… 43
Figure 16: Expected Number of Semisubmersibles to be Delivered,
by Year… 45
Figure 17: Expected Number of Drillships to be Delivered, by Year… 49
Figure 18: Expected Number of Tender Rigs to be Delivered, by Year… 50
Figure 19: Global In-Service Rig Fleet Status as of August 2011, by
Rig Type… 52
Figure 20: Global Newbuild Rig Fleet Status as of August 2011,
by Rig Type… 53
Figure 21: Number of Offshore Rigs, by Current Status and Rig Type… 53
Figure 22: Expected Newbuild Jack-Up Rigs, by Country of Manufacturing
Shipyard… 97
Figure 23: Expected Newbuild Semisubmerible Rigs, by Country of
Manufacturing Shipyard… 98
Figure 24: Expected Newbuild Drillships, by Country of Manufacturing
Shipyard… 99
Figure 25: Expected Newbuild Tender Rigs, by Country of Manufacturing
Shipyard… 100

Summary

A leading business intelligence provider, has released
its latest research, “Offshore Rig Construction Market to 2015 and
Current Rig Deployment Scenario - Acquisition of Rivals a Prominent
Strategic Option”. The study, which is an offering from the company’s
Energy Research Group, provides an in-depth analysis of the global
offshore rig construction market and highlights various concerns, key
trends and challenges, along with major companies in the industry. The
report provides forecasts for the offshore rig construction industry
to 2015. It also provides segmental forecasts of the offshore rig
construction market worldwide by rig type, and provides comprehensive
data on current offshore rigs deployed globally, by rig type. The report
also provides in-depth information on new build rig orders by major
offshore drilling contractors, by country of rig manufacturing shipyard,
and expected new builds and their expected deployment time. The report
is built using data and information sourced from proprietary databases,
primary and secondary research, and in-house analysis by this
team of industry experts.

As most countries which possess commercial potential in terms of their
offshore reserves seek to achieve energy self-sufficiency, the offshore
exploration and production industry is expected to make significant
investments in the discovery and development of new offshore reserves.
In turn, this will lead to infrastructure investments by exploration
and production companies in the form of new build offshore rigs, particularly
for untapped shallow water regions with exploration potential. Subsequently,
offshore rig construction expenditure is expected to rise from 2011–2015.

As shallow water drilling activity is expected to substantially rise, the
business potential for harshenvironment and premium and ultra-premium
jack-up rig construction companies is expected to be strong. Also, at present,
rig contractors prefer to acquire rival companies as part of their business
strategy in order to gain a competitive edge.

Scope


The report provides in-depth analysis of the major factors affecting the
offshore rig construction industry worldwide. Its scope includes -
- Overview and analysis of the global offshore rig construction market to 2015
- Analysis of the historical trends and forecasts to 2015
- Segmental forecasts of offshore rig construction expenditure, by rig type
- Country-specific data with regard to new builds
- Comprehensive data of currently deployed offshore rigs, by rig type
- Analysis of the opportunities and challenges in the global offshore rig
construction industry

Reasons to buy

- Develop business strategies with the help of specific insights about the global 
enhanced production services industry. 
- Identify key trends and challenges in the global enhanced production services 
industry.
- Increase future revenues and profitability with the help of insights on the 
expected demand-supply scenario of specific sub-segments of the enhanced 
production services.
- Benchmark your operations and strategies using key insights from the 
major current and expected business developments with regards to the 
enhanced production services industry.

Single User Price : $3,500
Site License Price : $7,000
Enterprisewide Price (Global Site License) : $10,500
 

Disclaimer
All Rights Reserved.

No part of this publication may be reproduced, stored in a retrieval system or transmitted
in any form by any means, electronic, mechanical, photocopying, recording or otherwise,
without the prior permission of the publisher.

The facts of this report are believed to be correct at the time of publication but cannot be
guaranteed. Please note that the findings, conclusions and recommendations that the
publisher delivers will be based on information gathered in good faith from both primary
and secondary sources, whose accuracy we are not always in a position to guarantee.
As such the publisher accept no liability whatever for actions taken based on any
information that may subsequently prove to be incorrect.

To order this report, please send an email to mail@worldoils.com

------------------------------------------------------------------------------------------------------------
Search words (for official use only) :

Offshore Rig Construction Market – Overview
Key Segments of the Offshore Rig Construction Industry
Premium and Ultra-Premium Jack-Up Rigs
Offshore Rig Order Costs, Forecasts to 2015, by Segment
Geographic Scenario of the Global Offshore Rig Construction Industry
Key Trends of the Offshore Rig Construction Industry
Offshore Rig Construction Newbuild Expenditure Forecasts

----------------------------------------------------------------------------------------------------------

     
Worldoils Oil, Gas and Offshore Marketplace
Worldoils Oil, Gas and Offshore Marketplace - Offshore Rig Construction Market to 2015 and Current Rig Deployment Scenario
Images
 
Offshore Rig Construction Market to 2015 and Current  Rig Deployment Scenario
 

To enquire on this equipment, please send an email to

The information contained herein is believed to be accurate but has not been verified. This equipment is subject to prior sale and sold “where-is as-is” with no warranties from Worldoils Pte Ltd or the Seller expressed or implied.
Worldoils Oil, Gas and Offshore Marketplace    Worldoils Oil, Gas and Offshore Marketplace

 

Worldoils Land Rigs Market
1000hp Land Drilling Rigs
1500hp Rotary Land Drilling Rigs
2000hp Rotary Land Drilling Rigs
3000hp Rotary Land Drilling Rigs
Workover Land Rigs
Carrier Mounted Land Drilling Rigs
Trailer Mounted Land Drilling Rigs

Oilfield Container Camps

Oil Booster Pump for Wellhead Platforms

Offshore Jackup Rigs
Land Drilling Rigs
Barge  Swamp Rigs

Live Monitoring of Ships and rigs

Remote ship Bunker GFuel Monitoring

Ring Maintenance Software

New Offshore Jackup Rigs

Oil Rig Jobs

Helicopters for Sale, Helicopters for Oil Rig Services


 

If you cannot find the new or used offshore rigs, vessels or equipment of any type, size or make that you are looking for, please send us an email to and we shall offer you.

Offshore Rig Construction Market to 2015 and Current Rig Deployment Scenario
Worldoils Oil, Gas and Offshore Marketplace    
Worldoils Oil, Gas and Offshore Marketplace

Equipment ID   : 1151
Equipment name   : Offshore Rig Construction Market to 2015 and Current Rig Deployment Scenario
Category   : Research Reports
 
Specifications  :
Name of the Report :
Offshore Rig Construction Market to 2015 and Current
Rig Deployment Scenario - Acquisition of Rivals a Prominent
Strategic Option

Published Date : 31-Oct-2011
No. of pages : 103

Table of Contents : 
1 Table of Contents
1 Table of Contents… 4
1.1 List of Tables… 6
1.2 List of Figures… 7
2 Future of the Offshore Rig Construction Market and Current
Rig Deployment Scenario – Introduction… 8
2.1 Report Guidance… 8
3 Offshore Rig Construction Market – Overview… 9
3.1 Significance of the Offshore Rig Construction Industry as
Part of the Value Chain in the Upstream Oil and Gas Sector… 9
3.2 Key Segments of the Offshore Rig Construction Industry… 9
3.2.1 Jack-Up Rigs… 9
3.2.2 Semisubmersibles… 9
3.2.3 Drillships… 9
3.2.4 Fixed Platforms… 9
3.2.5 Compliant Towers… 10
3.2.6 Tension Leg Platforms (TLPs)… 10
3.2.7 Spar Platforms… 10
3.2.8 Barges… 10
3.2.9 Tender Rigs… 10
3.2.10 Premium and Ultra-Premium Jack-Up Rigs… 10
4 Offshore Rig Construction Market to 2015 – Geographic and
Segment Analysis… 11
4.1 Geographic Scenario of the Global Offshore Rig Construction
Industry… 11
4.2 Segmental Analysis of the Global Offshore Rig Construction
Industry… 12
5 Key Trends and Challenges in the Offshore Rig Construction 
Industry… 14
5.1 Key Trends of the Offshore Rig Construction Industry… 14
5.1.1 Offshore Rig Contractors are Acquiring Rivals as a Beneficial
Business Strategy Due to Increasing Cost of Rig Manufacturing and
the Poor Credit Situation… 14
5.1.2 Offshore Upstream Sector is Expected to Record a Significant
Rise in Jack-Up Rig Construction Activity Due to Increasing Demand
for Shallow Water Offshore Development… 14
5.1.3 Rapidly Growing Demand for Premium and Ultra-Premium Jack-Ups
will Create a Shortage of Premium Jack-Ups by 2015… 14
5.1.4 Improved Risk Assessment Will Reduce Costs and Time Delay for
Rig Construction Projects… 15
5.1.5 Rig Construction is Expected to be Strengthened by the South
East Asian Rig Construction Industry… 15
5.1.6 Rise in Deep and Ultra-Deep Water Drilling in Brazil is Expected
to Strengthen the Drillship Construction Industry… 15
5.2 Major Challenges of the Offshore Rig Construction Industry… 16
5.2.1 Cost Dynamics are Proving to be Unfavorable to the Brazilian
Offshore Rig Construction Industry Due to Inadequate Workforce
Training and the Unattractive Labor Market… 16
5.2.2 Technological Developments in Offshore Rig Construction could
Lead to Successful Exploration and Production in Geographically
Challenging Areas… 16
5.2.3 Stricter Offshore Regulations for Safety and Environmental
Protection Will Lead to Technological Modifications in the
Engineering Design of Offshore Rigs… 16
6 Offshore Rig Construction Industry Forecasts to 2015 and Current
Status of Worldwide Offshore Fleet in Operation… 17
6.1 Offshore Rig Construction Newbuild Expenditure Forecasts to
2015… 17
6.2 Offshore Rig Construction Newbuild Expenditure Forecasts to
2015, by Segment… 19
6.2.1 Offshore Rig Construction Newbuild Expenditure Forecasts to
2015, Jack-Up Rigs… 19
6.2.2 Offshore Rig Construction Newbuild Expenditure Forecasts to
2015, Semisubmersible Rigs… 23
6.2.3 Offshore Rig Construction Newbuild Expenditure Forecasts to
2015, Drillships… 25
6.3 Offshore Rig Order Costs, Forecasts to 2015, by Segment… 27
6.3.1 Offshore Rig Order Costs, Forecasts to 2015, Jack-Up Rigs… 27
6.3.2 Offshore Rig Order Costs, Forecasts to 2015, Semisubmersible
Rigs… 31
6.3.3 Offshore Rig Order Costs, Forecasts to 2015, Drillships… 32
6.4 Newbuild Rig Orders by Offshore Drilling Contractors… 34
6.5 Pending Rig Orders by Rig Segment and Rig Availability in
Future… 39
6.5.1 Pending Rig Orders and Rig Availability, Jack-Up Rigs,
Updated August 2011… 39
6.5.2 Pending Rig Orders and Rig Availability, Semisubmersibles,
Updated August 2011… 44
6.5.3 Pending Rig Orders and Rig Availability, Drillships,
Updated August 2011… 46
6.5.4 Pending Rig Orders and Rig Availability, Tender Rigs,
Updated August 2011… 50
6.5.5 Pending Rig Orders and Rig Availability, Inland Barges,
Updated August 2011… 51
6.6 Current Status of Worldwide Offshore Rigs and Expected
Newbuilds… 51
6.6.1 Current Status, Number of Worldwide Offshore Rigs and
Expected Newbuilds… 51
6.7 Current Status of Worldwide Fleet in Operation by Individual
Offshore Structure and Type, and Deployment Location… 56
6.7.1 Current Status, Worldwide Fleet in Operation, Jack-Up Rigs,
by Structure Name, Deployment Location and Region… 56
6.7.2 Current Status, Worldwide Fleet in Operation, Semisubmersible
Rigs, by Structure Name, Deployment Location and Region… 73
6.7.3 Current Status, Worldwide Fleet in Operation, Drillships,
by Structure Name, Deployment Location and Region… 79
6.7.4 Current Status, Worldwide Fleet in Operation, Inland Barges,
by Structure Name, Deployment Location and Region… 82
6.7.5 Current Status, Worldwide Fleet in Operation, Drill Barges,
by Structure Name, Deployment Location and Region… 85
6.7.6 Current Status, Worldwide Fleet in Operation, Tender Rigs,
by Structure Name, Deployment Location and Region… 87
6.7.7 Current Status, Worldwide Fleet in Operation, Platform Rigs,
by Structure Name, Deployment Location and Region… 88
6.7.8 Current Status, Worldwide Fleet in Operation, Submersibles,
by Structure Name, Deployment Location and Region… 96
6.8 Expected Newbuild Offshore Rigs, by Country of Manufacturing
Shipyard… 97
6.8.1 Expected Newbuild Jack-Up Rigs, by Country of Manufacturing
Shipyard… 97
6.8.2 Expected Newbuild Semisubmersible Rigs, by Country of
Manufacturing Shipyard… 98
6.8.3 Expected Newbuild Drillships, by Country of Manufacturing
Shipyard… 99
6.8.4 Expected Newbuild Inland Barges, by Country of Manufacturing
Shipyard… 100
6.8.5 Expected Newbuild Tender Rigs, by Country of Manufacturing
Shipyard… 100
 
List of Tables

1.1 List of Tables
Table 1: Offshore Rig Construction Industry, Global Revenue (%),
2010… 11
Table 2: Global Offshore Rig Construction Industry, Segment
Analysis, Number of Rigs, 2011–2015… 13
Table 3: Total Annual Newbuild Construction Expenditure Forecasts
($bn), 2000–2015… 18
Table 4: Newbuild Jack-Up Rig Construction Expenditure Forecasts
($bn), 2000–2015… 20
Table 5: Newbuild Jack-Up Rig Construction Expenditure Forecasts,
Standard Segment ($bn), 2000–2015… 21
Table 6: Newbuild Jack-Up Rig Construction Expenditure Forecasts,
Premium/Ultra-Premium Segment ($bn), 2000–2015… 22
Table 7: Newbuild Semisubmersible Rig Construction Expenditure
Forecasts ($bn), 2000–2015… 24
Table 8: Newbuild Drillship Construction Expenditure Forecasts
($bn), 2000–2015… 26
Table 9: Jack-Up (Standard and Premium/Ultra-Premium Segment
Combined) Rig Order Cost ($m Per Rig), 2000–2015… 28
Table 10: Standard Jack-Up Rig Order Cost ($m Per Rig),
2000–2015… 29
Table 11: Premium and Ultra-Premium Jack-Up Rig Order Cost
($m Per Rig), 2000–2015… 30
Table 12: Semisubmersible Rig Order Cost ($m Per Rig),
2000–2015… 31
Table 13: Drillship Order Cost ($m Per Rig), 2000–2015… 33
Table 14: Newbuild Rig Orders, Updated August 2011… 34
Table 15: Newbuild Rig Construction Orders by Offshore Drilling
Contractor, Updated August 2011… 35
Table 16: Worldwide Jack-Ups Construction Survey, Updated August
2011… 39
Table 17: Expected Number of Jack-Ups to be Delivered, by Year… 43
Table 18: Worldwide Semisubmersibles Construction Survey,
Updated August 2011… 44
Table 19: Expected Number of Semisubmersibles to be Delivered,
by Year… 45
Table 20: Worldwide Drillships Construction Survey, Updated August
2011… 46
Table 21: Expected Number of Drillships to be Delivered, by Year… 49
Table 22: Worldwide Tender Rigs Construction Survey, Updated August
2011… 50
Table 23: Expected Number of Tender Rigs to be Delivered, by Year… 51
Table 24: Worldwide Inland Barges Construction Survey, Updated August
2011… 51
Table 25: Offshore Rigs and Expected Newbuilds, as of August 2011… 51
Table 26: Global In-Service Rig Fleet Status as of August 2011,
by Rig Type… 52
Table 27: Number of Offshore Rigs, by Current Status and Rig Type… 54
Table 28: Current Status, Worldwide Fleet in Operation, Jack-Up Rigs,
by Structure Name, Deployment Location and Region… 56
Table 29: Current Status, Worldwide Fleet in Operation, Semisubmersible
Rigs, by Structure Name, Deployment Location and Region… 73
Table 30: Current Status, Worldwide Fleet in Operation, Drillships,
by Structure Name, Deployment Location and Region… 79
Table 31: Current Status, Worldwide Fleet in Operation, Inland Barges,
by Structure Name, Deployment Location and Region… 82
Table 32: Current Status, Worldwide Fleet in Operation, Drill Barges,
by Structure Name, Deployment Location and Region… 85
Table 33: Current Status, Worldwide Fleet in Operation, Tender Rigs,
by Structure Name, Deployment Location and Region… 87
Table 34: Current Status, Worldwide Fleet in Operation, Platform Rigs,
by Structure Name, Deployment Location and Region… 88
Table 35: Current Status, Worldwide Fleet in Operation, Submersibles,
by Structure Name, Deployment Location and Region… 96
Table 36: Expected Newbuild Jack-Up Rigs, by Country of Manufacturing
Shipyard… 97
Table 37: Expected Newbuild Semisubmerible Rigs, by Country of
Manufacturing Shipyard… 98
Table 38: Expected Newbuild Drillships, by Country of Manufacturing
Shipyard… 99
Table 39: Expected Newbuild Inland Barges, by Country of Manufacturing
Shipyard… 100
Table 40: Expected Newbuild Tender Rigs, by Country of Manufacturing
Shipyard… 100
Table 41: Abbreviations… 102
 
List of Figures

1.2 List of Figures
Figure 1: Offshore Rig Construction Industry, Global Revenue
(%), 2010… 11
Figure 2: Global Offshore Rig Construction Industry, Segment
Analysis, Number of Rigs, 2011–2015… 12
Figure 3:Total Annual Newbuild Construction Expenditure Forecasts
($bn), 2000–2015… 17
Figure 4: Newbuild Jack-Up Rig Construction Expenditure Forecasts
($bn), 2000–2015… 19
Figure 5: Newbuild Jack-Up Rig Construction Expenditure Forecasts,
Standard Segment ($bn), 2000–2015… 21
Figure 6: Newbuild Jack-Up Rig Construction Expenditure Forecasts,
Premium/Ultra-Premium Segment ($bn), 2000–2015… 22
Figure 7: Newbuild Semisubmersible Rig Construction Expenditure
Forecasts ($bn), 2000–2015… 23
Figure 8: Newbuild Drillship Construction Expenditure Forecasts
($bn), 2000–2015… 25
Figure 9: Jack-Up (Standard and Premium/Ultra-Premium Segment Combined)
Rig Order Cost ($m Per Rig), 2000–2015… 27
Figure 10: Standard Jack-Up Rig Order Cost ($m Per Rig), 2000–2015… 29
Figure 11: Premium and Ultra-Premium Jack-Up Rig Order Cost
($m Per Rig), 2000–2015… 30
Figure 12: Semisubmersible Rig Order Cost ($m Per Rig), 2000–2015… 31
Figure 13: Drillship Order Cost ($m Per Rig), 2000–2015… 32
Figure 14: Newbuild Rig Orders, Updated August 2011… 34
Figure 15: Expected Number of Jack-Ups to be Delivered, by Year… 43
Figure 16: Expected Number of Semisubmersibles to be Delivered,
by Year… 45
Figure 17: Expected Number of Drillships to be Delivered, by Year… 49
Figure 18: Expected Number of Tender Rigs to be Delivered, by Year… 50
Figure 19: Global In-Service Rig Fleet Status as of August 2011, by
Rig Type… 52
Figure 20: Global Newbuild Rig Fleet Status as of August 2011,
by Rig Type… 53
Figure 21: Number of Offshore Rigs, by Current Status and Rig Type… 53
Figure 22: Expected Newbuild Jack-Up Rigs, by Country of Manufacturing
Shipyard… 97
Figure 23: Expected Newbuild Semisubmerible Rigs, by Country of
Manufacturing Shipyard… 98
Figure 24: Expected Newbuild Drillships, by Country of Manufacturing
Shipyard… 99
Figure 25: Expected Newbuild Tender Rigs, by Country of Manufacturing
Shipyard… 100

Summary

A leading business intelligence provider, has released
its latest research, “Offshore Rig Construction Market to 2015 and
Current Rig Deployment Scenario - Acquisition of Rivals a Prominent
Strategic Option”. The study, which is an offering from the company’s
Energy Research Group, provides an in-depth analysis of the global
offshore rig construction market and highlights various concerns, key
trends and challenges, along with major companies in the industry. The
report provides forecasts for the offshore rig construction industry
to 2015. It also provides segmental forecasts of the offshore rig
construction market worldwide by rig type, and provides comprehensive
data on current offshore rigs deployed globally, by rig type. The report
also provides in-depth information on new build rig orders by major
offshore drilling contractors, by country of rig manufacturing shipyard,
and expected new builds and their expected deployment time. The report
is built using data and information sourced from proprietary databases,
primary and secondary research, and in-house analysis by this
team of industry experts.

As most countries which possess commercial potential in terms of their
offshore reserves seek to achieve energy self-sufficiency, the offshore
exploration and production industry is expected to make significant
investments in the discovery and development of new offshore reserves.
In turn, this will lead to infrastructure investments by exploration
and production companies in the form of new build offshore rigs, particularly
for untapped shallow water regions with exploration potential. Subsequently,
offshore rig construction expenditure is expected to rise from 2011–2015.

As shallow water drilling activity is expected to substantially rise, the
business potential for harshenvironment and premium and ultra-premium
jack-up rig construction companies is expected to be strong. Also, at present,
rig contractors prefer to acquire rival companies as part of their business
strategy in order to gain a competitive edge.

Scope


The report provides in-depth analysis of the major factors affecting the
offshore rig construction industry worldwide. Its scope includes -
- Overview and analysis of the global offshore rig construction market to 2015
- Analysis of the historical trends and forecasts to 2015
- Segmental forecasts of offshore rig construction expenditure, by rig type
- Country-specific data with regard to new builds
- Comprehensive data of currently deployed offshore rigs, by rig type
- Analysis of the opportunities and challenges in the global offshore rig
construction industry

Reasons to buy

- Develop business strategies with the help of specific insights about the global 
enhanced production services industry. 
- Identify key trends and challenges in the global enhanced production services 
industry.
- Increase future revenues and profitability with the help of insights on the 
expected demand-supply scenario of specific sub-segments of the enhanced 
production services.
- Benchmark your operations and strategies using key insights from the 
major current and expected business developments with regards to the 
enhanced production services industry.

Single User Price : $3,500
Site License Price : $7,000
Enterprisewide Price (Global Site License) : $10,500
 

Disclaimer
All Rights Reserved.

No part of this publication may be reproduced, stored in a retrieval system or transmitted
in any form by any means, electronic, mechanical, photocopying, recording or otherwise,
without the prior permission of the publisher.

The facts of this report are believed to be correct at the time of publication but cannot be
guaranteed. Please note that the findings, conclusions and recommendations that the
publisher delivers will be based on information gathered in good faith from both primary
and secondary sources, whose accuracy we are not always in a position to guarantee.
As such the publisher accept no liability whatever for actions taken based on any
information that may subsequently prove to be incorrect.

To order this report, please send an email to mail@worldoils.com

------------------------------------------------------------------------------------------------------------
Search words (for official use only) :

Offshore Rig Construction Market – Overview
Key Segments of the Offshore Rig Construction Industry
Premium and Ultra-Premium Jack-Up Rigs
Offshore Rig Order Costs, Forecasts to 2015, by Segment
Geographic Scenario of the Global Offshore Rig Construction Industry
Key Trends of the Offshore Rig Construction Industry
Offshore Rig Construction Newbuild Expenditure Forecasts

----------------------------------------------------------------------------------------------------------

     
Worldoils Oil, Gas and Offshore Marketplace
Worldoils Oil, Gas and Offshore Marketplace - Offshore Rig Construction Market to 2015 and Current Rig Deployment Scenario
Images
 
Offshore Rig Construction Market to 2015 and Current  Rig Deployment Scenario
 

To enquire on this equipment, please send an email to

The information contained herein is believed to be accurate but has not been verified. This equipment is subject to prior sale and sold “where-is as-is” with no warranties from Worldoils Pte Ltd or the Seller expressed or implied.
Worldoils Oil, Gas and Offshore Marketplace    
Worldoils Oil, Gas and Offshore Marketplace

 


 

If you cannot find the new or used offshore rigs, vessels or equipment of any type, size or make that you are looking for, please send us an email to and we shall offer you.


.......................................................................
www.worldoils.com |  Disclaimer