Chinese RG 1300 Triple Drilling Rig for Sale
Trailer Mounted Mechanical Drilling Rig for Sale
1300 hp Land Drilling Rig for Sale
Description
Classification : 1300 H.P. land rig rated to 13,500
Manufacturer : RG – Petro
Delivery date : August 29, 2007 (New)
I-Drawworks
- RG Model JC28E, max speed 450 rpm – API spec 7K
- Rated @ 1300 HP
- Fast line pull 62,107 lbs
- Diameter : 40 inch x 25 inches
- ATD 330H axial thrust disc clutch (New from WPT 2 qtr. 2013)
- Drawworks fitted with disc brakes – 14,330 lbs positive pressure
per rim (Function tested by 3rd party by TCM-Offshore)
- Disc brakes have separate hydraulic system that has been function tested
by 3rd party (TCM-Offshore)
- Eaton Model 324 auxiliary brake – water cool – separate tankage
(16’L x 8’6”W) appx 100 gls
- 1 ¼” drill line – 6 x 5 travelling system – 0.65 fps hoisting speeds
- Crown-O-Matic toggle valve crown saver (rebuilt by TCM-offshore
and function tested)
II - Trailer
- Model ES 9660 with Mast Crown and Standpipe
- (6) axle, triple steel board, balanced suspension. (2) Air lift (3) Spring,
12 x 20 double tires
- OAL 55’ L x 11’8”W x 14’ H with mast on
- Back overhang 5’4”
- Axle spacing 4’6”
- (6) x 26,000 lbs. axles
III - Substructure
- Model ZZ225 rated at 500,000 lbs – pill test 580K
- Floor height – 19’ 8-1/2” (scoped up)
- 11’6” W x 30’ L x 10’3”H (scoped down)
- Under rotary 17’ 6”
- Mechanical raise with adjustments for uneven locations
- Floor – 24 feet x 20 feet complete with 2 walkways, and trailer walkway ladder.
(All new 2 qtr. 2013)
IV - Derrick and Traveling Equipment
- Model JJ32 – API 4F triple 151’ x 505,000 lbs. (clear height 134’)
- 68’5” (scoped in)
- Board heights – 86.5 feet / 88 feet / 89.2 feet
- Raising speed – 14 minutes from horizontal
- Hydraulically scoped (All cylinders fully repaired & tested by Texas hydraulics 2 qtr. 2013)
13,500 feet 4 ½ “ pipe racking capacity
- Wind resistance – 110 km/hr
- Complete with explosion-proof lighting / parameter lighting repaired 2nd qtr. 2013.
- Complete with Geronimo line, sala block, tong cylinders and 3st rack winch
- 4” x 5000 psi standpipe (removed, blasted, primed, painted and tested to 7500 psi
by 3rd party) And 3” ID x 60’ Kelly hose
- Crown Model TC-225 API (F40052 crown), 250-ton capacity, 10 lines, (5) 36” x
1-1/4” sheaves.(All sheaves have been removed, MPI’d by 3rd party and
bearings replaced)
V - Rotary Drive System
- Model ZP 275 – 27 ½ inch opening rated @ 500 ton – API 7k removed from
floor, shopped, cleaned and bearings replaced by TCM–Offshore 2nd qtr. 2013
- Max speed – 300 rpm
- Static loading – 1,000,000 lbs
- Torque – 20,265 foot lbs
- Complete with 1, 2, and 3 bowls
- Right angle gear box driven (shopped, mopped and function
tested by TCM-Offshore 2 Qtr. 2013)
- Permanent and ratcheting type locking systems
- Rotary torque sensor
- Master bushing rated for 500 tons with API #3 interior – pin drive
VI - Liquid Capabilities
- Fuel oil : 10,000 gallons 34’ L x 8’ W x 10’ H skidded c/w loading hitches
- Process tank : 70 barrels
- Drill water : 18,000 gallons 30’ L x 10’ W x 10’ skidded c/w loading hitches
VII – Rig Power
- Two each Caterpillar C-18 (AR# 237-1955), (SN# WJH01603), (AR# 237-1955),
(SN# WJH01604) electronic engines complete with Alison 6061 transmissions.
(All above have been function tested and serviced according to Caterpillar and
Steward & Stevenson recommendations, by TCM-Offshore 2nd Qtr. 2013)
- Two redundant hydraulic pumps mounted on transmissions for raising/lowering mast
- Compound box Model BXJ, input speed max 2500 rpm, output torque 19,176 foot lbs
- Rotary transmission – Model ZX140, 2100 rpm max, input torque 10,360 foot lbs
VIII – Generator House
- Two Volvo diesel engines (Model TAD1641GE) 1800 rpm, 565 kw (serviced
by TCM-Offshore 2nd qtr. 2013)
- Two Samford generators 400 kw, 60 Hz, 3Ph, 1800 rpm (serviced by TCM-Offshore
2nd qtr. 2013)
- Electronic engine control panels (2) (serviced by TCM-Offshore 2nd qtr. 2013)
- Fully enclosed house 31’ L x 9’7” W x 10’6” H c/w loading hitches
- Engines covered, generators covered and house was sandblasted, primed and
painted 2 qtr. 2013
IX – MCC House
- RG system – 3 gen cubicles – 4 MCC cubicles (All new wiring was run,
receptacles changed to Appleton, and all telemecanique and Merlin Gerlin
breakers and switch gear was installed 2 qtr. 2013, and supplied by Grainger
supply in Houston
- 500 kva 480 to 240/110 VAC transforms
- 480 vac MCC panel
- Air conditioned house c/w work desk, interior lighting, outside plug in receptacle
panel
- MCC house 31’3” L x 9’ W x 10’6” H c/w loading hitches was professionally
vacuumed, all contacts were cleaned and new flooring replaced 2qtr. 2013.
- Soft start cabinet #1
Merlin Gerin – NSC 160S 125 A breaker (x4)
Telemecanique – LCID115 magnetic contractor (x7)
Telemecanique – ND / NC push buttons ZB2BW06.C
Telemecanique – Schneider button indicator XB2-BVB4LC (x6)
Telemecanique – Switch ZB2-BE101C
Telemecanique – Contact block LADN11 (x6)
Allen Bradley – Motor controller SMC 135 amp 480 Vac 150-A135NBD
- Soft start cabinet #2
Merlin Gerin – NSC 160S 125 A breaker (x4)
Telemecanique – LCID115 magnetic contractor (x7)
Telemecanique – ND / NC push buttons ZB2BW06.C
Telemecanique – Schneider button indicator XB2-BVB4LC (x6)
Telemecanique – Switch ZB2-BE101C
Telemecanique – Contact block LADN11 (x6)
Allen Bradley – Motor controller SMC 135 amp 480 Vac 150-A135NBD
Merlin Gerin – NSC 160S 125 A breaker (x4)
Telemecanique – LCID115 magnetic contractor (x7)
Telemecanique – ND / NC push buttons ZB2BW06.C
Telemecanique – Schneider button indicator XB2-BVB4LC (x6)
Telemecanique – Switch ZB2-BE101C
Telemecanique – Contact block LADN11 (x6)
Allen Bradley – Motor controller SMC 135 amp 480 Vac 150-A135NBD
Feeder Cabinet 02 – A
A1 thru A8 : ABB S1 breakers
A9-A10 : ABB breaker MS 325 690V
A11-A12 : ABB S2 breaker I4 = 160A UE = 690V
A13 : ABB S3 breaker I4 = 250A UE = 690V
Incoming Cabine 480V
ABB S1 – I4 = 125A 4E = 500V (x2) breaker
ABB SACE F1-IN = 1250A UE = 415V (x2)
CHNT transformer – 480V/240V NDK (BK) – 300 50/60 HZ (x2)
RT14-20-IEC = 269 GB = 13529 20A 380V
Lighting Cabinet – C
C1, C2, C3, C6, C11, C12, C13, C14 : ABB S1 Breaker, IU = 125A 4E = 500v
C4, C5, C7, C8, C9, C10, C15, C16, C17, C18, C19, C20 : S252S Breaker
C25, IEC-30898, GB-1096
Feeder Cabinet 01 – B
B1 thru B8 : ABB S1 Breaker, IU = 125A UE = 500V
B9-B10 : ABB breaker MS 325 690V
B11-B12 : ABB S2 breaker I4 = 160A UE = 690V
B13 : ABB S3 breaker IU = 250A UE = 690V
X – Air Compressor House
- All compressors, switchgear and volume tanks were serviced by McKenzie
compressors 2nd. Qtr. 2013
- Sullair (2) 220 CFM screw compressors Model LS 12-50HHAC SULL
- (2) 400-gallon air receivers ASME approved
- SRC 200 dryer refrigerant
- SRC 220 dryer
- Two each 50HP Model LS12-50H helical air compressors, 50HP, 37 Kw, 187 cfm
- Separator and volume tanks
- Fully enclosed house 32’ L x 9’9” W x 10’ H c/w loading hitches
XI - Blow Out Prevention System
- One (1) accumulator system Burnsco 5 station 3000psi working pressure,
with 2 each 60:1 air pumps and 1 each 15hp electric motor driven triplex pump
with 7/8” plungers – 11 gallon bladder type 12 (bottles) – ASME vessels, drillers
control panel – API complaint unit, master skidded c/w loading hitches.
XII – Auxiliary Equipment
- Brake cooling tank with pumps and heat exchanger (below drillers house – one skid)
- (1) 20’ container with associated spare parts/components for deck engines,
drawworks and drive lines
- Two hydraulic cathead cylinders – 33,708 lbs pull
- Two drawworks winches – 3 short tons and 5 short tons replaced with new Certex wire 2013
- One swivel Model SL225 – 500,000 lbs x 5000 psi x 6 5/8 regular LH connection
- One CANRIG 275-ton top drive 5-sheave x 1-1/4” block
- Global safety valves (2) NC46 grey inside BOPS with releasing tools, (2) NC46 one piece
Hydril Style, lower Kelly valves, (1) 6-5/8” LH API reg upper Kelly cock. All items within
this bullet point will be divided equally between rig 70 & rig 71
- Misc. subs : Ace machine (3) NC46 wear subs 10” OAL, NC46 x 6-5/8” reg bit subs,
(2) NC 46 x 4-1/2” reg bit subs, (2) NC46 rubber kelly saver subs. All items within this bullet
point will be divided equally between rig 70 & rig 71.
- Deadline anchor with E-80 sensor – type D style
- Firefighting/safety extinguishes 10 to 30 lbs. All items within this bullet point will be divided
equally between Rig 70 & Rig 71.
- Sala blocks. All items within this bullet point will be divided equally between Rig 70 & Rig 71.
- Lad safety system for mast handling tools
XIII – Drillers Control Station and Control House
- Fully enclosed with explosion proof A/C
- Fully instrumentation package – hook, pump pressure, torque rpm, tong torque indicators
- Louisiana instrumentation type “F” weight indicator
Price & terms : Please enquire using the email form below.
If you cannot find the vessel, crane, rig or equipment that you need,
please send us an email to mail@worldoils.com stating your
requirements and we shall find it for you.
We can arrange delivery of equipment and towage of rigs and vessels where needed.
The details mentioned above are believed to be accurate but are not guaranteed.
---------------------------------------------------------------------------------------------------------------
Search words (for official use only) :
Chinese RG 1300 Mechanical Drilling Rig for Sale
1300hp Trailer Mounted Mechanical Drilling Rig
Chinese RG 1300 Triple Drilling Rig for Sale
Chinese RG 1300hp Mechanical Drilling Rig in USA
1300 hp Land Drill Rig for Sale in USA
Chinese RG 1300 Trailer Mounted Drilling Rigs
--------------------------------------------------------------------------------------------------------------- |